Rehabilitation and upgrading of 400 kV substations in order to interconnect the Romanian power system to the union for the coordination of transmission of electricity (U.C.T.E.)

P. Stroica, I. Merfu
{"title":"Rehabilitation and upgrading of 400 kV substations in order to interconnect the Romanian power system to the union for the coordination of transmission of electricity (U.C.T.E.)","authors":"P. Stroica, I. Merfu","doi":"10.1109/DRPT.2004.1338096","DOIUrl":null,"url":null,"abstract":"The paper shows an interesting case of three 400 kV substations, ones of the most important and great substations of the Romanian power system called Portile de Fier, Tantareni and Urechesti. The strategic task of the Romanian Transmission Electricity Company - TRANSELECTRICA - is to perform in the next years (2002-2005) the interconnection of the Romanian power system to the western European countries system, well known as union for the coordination of transmission of electricity-U.C.T.E. This task is to be realized in order to increase the static and dynamic stability, and to increase the reliability of the Romanian power system. In the year of 1996 was approved by the Romanian government a loan from the European bank for reconstruction and development for acquisition of modern equipment for these substations, such as: circuit breakers, disconnectors, instrument transformers, surge arresters, post type insulators, string insulators, batteries, battery chargers, protection, control and operating systems, telecommunication systems, etc. The paper shows the problems related to the criteria for choosing the new equipment, its technical specifications, and the works of replacing the old equipment with the new existing one. All the works is to be done considering that these substations must be in function, during the whole period of rehabilitation and upgrading.","PeriodicalId":427228,"journal":{"name":"2004 IEEE International Conference on Electric Utility Deregulation, Restructuring and Power Technologies. Proceedings","volume":"34 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2004-04-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2004 IEEE International Conference on Electric Utility Deregulation, Restructuring and Power Technologies. Proceedings","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/DRPT.2004.1338096","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The paper shows an interesting case of three 400 kV substations, ones of the most important and great substations of the Romanian power system called Portile de Fier, Tantareni and Urechesti. The strategic task of the Romanian Transmission Electricity Company - TRANSELECTRICA - is to perform in the next years (2002-2005) the interconnection of the Romanian power system to the western European countries system, well known as union for the coordination of transmission of electricity-U.C.T.E. This task is to be realized in order to increase the static and dynamic stability, and to increase the reliability of the Romanian power system. In the year of 1996 was approved by the Romanian government a loan from the European bank for reconstruction and development for acquisition of modern equipment for these substations, such as: circuit breakers, disconnectors, instrument transformers, surge arresters, post type insulators, string insulators, batteries, battery chargers, protection, control and operating systems, telecommunication systems, etc. The paper shows the problems related to the criteria for choosing the new equipment, its technical specifications, and the works of replacing the old equipment with the new existing one. All the works is to be done considering that these substations must be in function, during the whole period of rehabilitation and upgrading.
修复和升级400千伏变电站,以便将罗马尼亚电力系统与协调电力传输联盟(U.C.T.E.)互连
本文展示了三个400千伏变电站的有趣案例,它们是罗马尼亚电力系统中最重要和最伟大的变电站之一,分别是Portile de Fier、Tantareni和Urechesti。罗马尼亚输电电力公司(TRANSELECTRICA)的战略任务是在未来几年内(2002-2005年)完成罗马尼亚电力系统与西欧国家系统的互联,即众所周知的电力传输协调联盟(u.c.t.e)。实现这一任务是为了提高静态和动态稳定性,提高罗马尼亚电力系统的可靠性。1996年,罗马尼亚政府从欧洲银行批准了一笔用于重建和发展的贷款,用于为这些变电站购置现代化设备,如:断路器、隔离器、仪表变压器、避雷器、柱式绝缘子、串式绝缘子、电池、电池充电器、保护、控制和操作系统、电信系统等。本文介绍了新设备的选择标准、新设备的技术指标、旧设备换新工作等方面存在的问题。所有的工作都是考虑到这些变电站在整个修复和升级期间必须处于功能状态。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信