Task assignment in pipeline assembly systems

A. Agnetis, F. Nicolò, C. Arbib, M. Lucertini
{"title":"Task assignment in pipeline assembly systems","authors":"A. Agnetis, F. Nicolò, C. Arbib, M. Lucertini","doi":"10.1109/ROBOT.1992.220196","DOIUrl":null,"url":null,"abstract":"The authors deal with the problem of part flow management in a class of assembly systems characterized by a serial transportation system connecting the workstations. The system assembles a number of identical units, each requiring a set of operations. Each operation is performed by a workstation and each workstation can perform any operation. The problem consists of assigning the operations to the workstations to maximize some productivity index of the system. Usually, a tree-like precedence relationship exists among the operations (assembly tree). The problem is analyzed for the case in which a dominating path on the assembly tree exists. A polynomial time dynamic programming algorithm is presented for the optimal assignment of operations to workstations.<<ETX>>","PeriodicalId":307394,"journal":{"name":"Proceedings 1992 IEEE International Conference on Robotics and Automation","volume":"484 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1992-05-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings 1992 IEEE International Conference on Robotics and Automation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ROBOT.1992.220196","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The authors deal with the problem of part flow management in a class of assembly systems characterized by a serial transportation system connecting the workstations. The system assembles a number of identical units, each requiring a set of operations. Each operation is performed by a workstation and each workstation can perform any operation. The problem consists of assigning the operations to the workstations to maximize some productivity index of the system. Usually, a tree-like precedence relationship exists among the operations (assembly tree). The problem is analyzed for the case in which a dominating path on the assembly tree exists. A polynomial time dynamic programming algorithm is presented for the optimal assignment of operations to workstations.<>
管道装配系统的任务分配
研究了一类装配系统的零件流管理问题,该系统以连接工作站的串行运输系统为特征。该系统组装了许多相同的单元,每个单元都需要一套操作。每个操作由一个工作站执行,每个工作站可以执行任何操作。该问题包括将操作分配给工作站以最大化系统的某些生产力指标。通常,操作之间存在类似树的优先关系(组装树)。对装配树上存在主导路径的情况进行了分析。提出了一种多项式时间动态规划算法,用于工作站作业的最优分配。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书