{"title":"Task assignment in pipeline assembly systems","authors":"A. Agnetis, F. Nicolò, C. Arbib, M. Lucertini","doi":"10.1109/ROBOT.1992.220196","DOIUrl":null,"url":null,"abstract":"The authors deal with the problem of part flow management in a class of assembly systems characterized by a serial transportation system connecting the workstations. The system assembles a number of identical units, each requiring a set of operations. Each operation is performed by a workstation and each workstation can perform any operation. The problem consists of assigning the operations to the workstations to maximize some productivity index of the system. Usually, a tree-like precedence relationship exists among the operations (assembly tree). The problem is analyzed for the case in which a dominating path on the assembly tree exists. A polynomial time dynamic programming algorithm is presented for the optimal assignment of operations to workstations.<<ETX>>","PeriodicalId":307394,"journal":{"name":"Proceedings 1992 IEEE International Conference on Robotics and Automation","volume":"484 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1992-05-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings 1992 IEEE International Conference on Robotics and Automation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ROBOT.1992.220196","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
The authors deal with the problem of part flow management in a class of assembly systems characterized by a serial transportation system connecting the workstations. The system assembles a number of identical units, each requiring a set of operations. Each operation is performed by a workstation and each workstation can perform any operation. The problem consists of assigning the operations to the workstations to maximize some productivity index of the system. Usually, a tree-like precedence relationship exists among the operations (assembly tree). The problem is analyzed for the case in which a dominating path on the assembly tree exists. A polynomial time dynamic programming algorithm is presented for the optimal assignment of operations to workstations.<>