Real-time Allocation of Multi-Type Production Resource with Due Date grouping for MTO Manufacturing

Motoharu Tanaka, S. Arima
{"title":"Real-time Allocation of Multi-Type Production Resource with Due Date grouping for MTO Manufacturing","authors":"Motoharu Tanaka, S. Arima","doi":"10.1109/ISSM.2018.8651129","DOIUrl":null,"url":null,"abstract":"The simultaneous n-type resource allocation method SRAR2 was improved both in the computational time and the optimization levels in this study. The computational time becomes less than 1 second for the actual resource allocation problem of three types of resource and of 2 months demands (# decision variables:157440, wafer test process). SRAR2 and due-date oriented dispatching such as EDD (Earliest Due-date first) achieved the best performance as the result of supplemental effects.","PeriodicalId":262428,"journal":{"name":"2018 International Symposium on Semiconductor Manufacturing (ISSM)","volume":"4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 International Symposium on Semiconductor Manufacturing (ISSM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISSM.2018.8651129","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

The simultaneous n-type resource allocation method SRAR2 was improved both in the computational time and the optimization levels in this study. The computational time becomes less than 1 second for the actual resource allocation problem of three types of resource and of 2 months demands (# decision variables:157440, wafer test process). SRAR2 and due-date oriented dispatching such as EDD (Earliest Due-date first) achieved the best performance as the result of supplemental effects.
基于到期日分组的MTO制造多类型生产资源实时分配
同时n型资源分配方法SRAR2在计算时间和优化水平上都得到了改进。对于三种资源和2个月需求的实际资源分配问题(#决策变量:157440,晶圆测试过程),计算时间缩短至1秒以下。SRAR2和EDD(最早到期日优先)等面向到期日的调度由于互补效应而获得了最佳性能。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信