{"title":"Real-time Allocation of Multi-Type Production Resource with Due Date grouping for MTO Manufacturing","authors":"Motoharu Tanaka, S. Arima","doi":"10.1109/ISSM.2018.8651129","DOIUrl":null,"url":null,"abstract":"The simultaneous n-type resource allocation method SRAR2 was improved both in the computational time and the optimization levels in this study. The computational time becomes less than 1 second for the actual resource allocation problem of three types of resource and of 2 months demands (# decision variables:157440, wafer test process). SRAR2 and due-date oriented dispatching such as EDD (Earliest Due-date first) achieved the best performance as the result of supplemental effects.","PeriodicalId":262428,"journal":{"name":"2018 International Symposium on Semiconductor Manufacturing (ISSM)","volume":"4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 International Symposium on Semiconductor Manufacturing (ISSM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISSM.2018.8651129","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2
Abstract
The simultaneous n-type resource allocation method SRAR2 was improved both in the computational time and the optimization levels in this study. The computational time becomes less than 1 second for the actual resource allocation problem of three types of resource and of 2 months demands (# decision variables:157440, wafer test process). SRAR2 and due-date oriented dispatching such as EDD (Earliest Due-date first) achieved the best performance as the result of supplemental effects.