Laam Complex Realization Issues with Using of PMU's Data

S. Yolkin, E. N. Kolobrodov, T. Klimova
{"title":"Laam Complex Realization Issues with Using of PMU's Data","authors":"S. Yolkin, E. N. Kolobrodov, T. Klimova","doi":"10.1109/RPA51116.2020.9301729","DOIUrl":null,"url":null,"abstract":"There are some areas in electrical power system (EPS) which have asynchronous mode (AM) appearance probability. AM is determined as one of the hardest and the most dangerous emergency modes in EPS. This is connected with disturbance of generator and electrical station parallel work stability [1] . It leads to primary damage of electrical equipment because of the huge current in generator stator winding. Therefore, the disturbance of the generator and electrical station parallel work stability is the reason for decrease in auxiliary mechanism productivity at electrical stations. These effects cause customer electrical supply disturbance and are connected with critical economic losses [2] . Therefore, it is vital to determine AM selectively in appropriate time and to recover normal work mode of EPS.","PeriodicalId":299510,"journal":{"name":"2020 3rd International Youth Scientific and Technical Conference on Relay Protection and Automation (RPA)","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-10-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 3rd International Youth Scientific and Technical Conference on Relay Protection and Automation (RPA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/RPA51116.2020.9301729","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

There are some areas in electrical power system (EPS) which have asynchronous mode (AM) appearance probability. AM is determined as one of the hardest and the most dangerous emergency modes in EPS. This is connected with disturbance of generator and electrical station parallel work stability [1] . It leads to primary damage of electrical equipment because of the huge current in generator stator winding. Therefore, the disturbance of the generator and electrical station parallel work stability is the reason for decrease in auxiliary mechanism productivity at electrical stations. These effects cause customer electrical supply disturbance and are connected with critical economic losses [2] . Therefore, it is vital to determine AM selectively in appropriate time and to recover normal work mode of EPS.
利用PMU数据分析复杂的实现问题
在电力系统中,某些区域存在异步模式(AM)出现的概率。AM被确定为EPS中最困难、最危险的应急模式之一。这与发电机和电站并联工作稳定性的扰动有关[1]。发电机定子绕组电流过大,会导致电气设备的一次损坏。因此,发电机与电站并联工作稳定性的扰动是电站辅机生产率下降的原因。这些影响会造成客户供电干扰,并与重大经济损失有关[2]。因此,在适当的时间选择性地确定AM,恢复EPS的正常工作模式至关重要。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信