{"title":"Renegotiation of Public Contracts: An Empirical Analysis","authors":"F. Decarolis, Giuliana Palumbo","doi":"10.2139/ssrn.3475626","DOIUrl":null,"url":null,"abstract":"Using a dataset of public contracts awarded in Italy between 2000 and 2007, we document two facts: (i) both price and time renegotiations are systematic, but nearly uncorrelated to each other; (ii) renegotiations are linked to the project design stage.","PeriodicalId":103361,"journal":{"name":"ERN: Other European Economics: Political Economy & Public Economics (Topic)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"53","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ERN: Other European Economics: Political Economy & Public Economics (Topic)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.3475626","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 53
Abstract
Using a dataset of public contracts awarded in Italy between 2000 and 2007, we document two facts: (i) both price and time renegotiations are systematic, but nearly uncorrelated to each other; (ii) renegotiations are linked to the project design stage.