Defining optimal production capacity in a purely hydroelectric power system

E. Hreinsson, L. Barroso
{"title":"Defining optimal production capacity in a purely hydroelectric power system","authors":"E. Hreinsson, L. Barroso","doi":"10.1109/DRPT.2004.1338489","DOIUrl":null,"url":null,"abstract":"The conventional definition of system and plant firm capacity, in a thermally dominated power system, is often simply the installed MW adjusted by plant availability. A hydro dominated system requires an entirely different and expanded definition due to the complex interactions resulting from temporal reservoir operational decisions. In this paper several economic definitions of capacity are presented and analyzed based on the need for this concept in the operation and expansion of hydro dominated systems.","PeriodicalId":427228,"journal":{"name":"2004 IEEE International Conference on Electric Utility Deregulation, Restructuring and Power Technologies. Proceedings","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2004-04-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"23","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2004 IEEE International Conference on Electric Utility Deregulation, Restructuring and Power Technologies. Proceedings","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/DRPT.2004.1338489","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 23

Abstract

The conventional definition of system and plant firm capacity, in a thermally dominated power system, is often simply the installed MW adjusted by plant availability. A hydro dominated system requires an entirely different and expanded definition due to the complex interactions resulting from temporal reservoir operational decisions. In this paper several economic definitions of capacity are presented and analyzed based on the need for this concept in the operation and expansion of hydro dominated systems.
定义纯水力发电系统的最佳生产能力
在热电主导的电力系统中,系统和电厂的常规定义通常只是根据电厂可用性调整的装机兆瓦。水力控制的系统需要一个完全不同的和扩展的定义,由于复杂的相互作用造成的临时水库操作决策。本文根据水电系统运行和扩建对容量概念的需要,提出并分析了容量的几种经济定义。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信