Analisis Debit Banjir Rancangan Dan Kapasitas Tampang Sungai Di Sekitar Kawasan Sempadan Sungai Sokong Kabupaten Lombok Utara

Arifal Hidayat, Agustin Ernawati, Muhammad Khalis Ilmi
{"title":"Analisis Debit Banjir Rancangan Dan Kapasitas Tampang Sungai Di Sekitar Kawasan Sempadan Sungai Sokong Kabupaten Lombok Utara","authors":"Arifal Hidayat, Agustin Ernawati, Muhammad Khalis Ilmi","doi":"10.33084/mits.v11i2.4587","DOIUrl":null,"url":null,"abstract":"In line with the North Lombok Regency (KLU) government program to prioritize handling and structuring residential areas and disaster-prone areas in the Pemenang-Tanjung sub-district in 2022, it is necessary to carry out several technical studies to support the program. One of the technical studies that can be carried out is an analysis of the design flood and river capacity around the Sokong River section in Tanjung Village, which is a location that is classified as densely populated, with slums and residential areas close to the river border. This study aimed to determine the magnitude of the design flood discharge and the cross-sectional capacity of the Sokong river section. The method used in this study is a hydrological analysis using the Nakayasu Synthetic Unit Hydrograph method to determine the amount of design flood discharge for the 25-year return period (Q25th) and analysis of river cross-sectional capacity using Hec-RAS 4.1.0 software. The results of the analysis show that the Q25th that occurs along the Sokong River section is 131.32 m3/s and the simulation results use Hec-RAS 4.1.0 software. shows that the capacity of the Sokong River segment cannot accommodate the Q25th. Therefore, it is necessary to plan the arrangement of residential buildings around the border area of ​​the Sokong River by raising the elevation of the building to be free from flood inundation.","PeriodicalId":380506,"journal":{"name":"Media Ilmiah Teknik Sipil","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-06-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Media Ilmiah Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33084/mits.v11i2.4587","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In line with the North Lombok Regency (KLU) government program to prioritize handling and structuring residential areas and disaster-prone areas in the Pemenang-Tanjung sub-district in 2022, it is necessary to carry out several technical studies to support the program. One of the technical studies that can be carried out is an analysis of the design flood and river capacity around the Sokong River section in Tanjung Village, which is a location that is classified as densely populated, with slums and residential areas close to the river border. This study aimed to determine the magnitude of the design flood discharge and the cross-sectional capacity of the Sokong river section. The method used in this study is a hydrological analysis using the Nakayasu Synthetic Unit Hydrograph method to determine the amount of design flood discharge for the 25-year return period (Q25th) and analysis of river cross-sectional capacity using Hec-RAS 4.1.0 software. The results of the analysis show that the Q25th that occurs along the Sokong River section is 131.32 m3/s and the simulation results use Hec-RAS 4.1.0 software. shows that the capacity of the Sokong River segment cannot accommodate the Q25th. Therefore, it is necessary to plan the arrangement of residential buildings around the border area of ​​the Sokong River by raising the elevation of the building to be free from flood inundation.
根据北龙目岛(KLU)政府计划在2022年优先处理和构建Pemenang-Tanjung街道的居民区和灾害易感地区,有必要开展几项技术研究来支持该计划。可以进行的技术研究之一是对Tanjung村Sokong河段周围的设计洪水和河流容量进行分析,这是一个被归类为人口密集的位置,靠近河流边界的贫民窟和住宅区。本研究旨在确定设计洪流量的大小和Sokong河段的横断面容量。本研究采用的方法是采用Nakayasu合成单元水线法进行水文分析,确定25年回复期(q25)的设计洪流量,并使用Hec-RAS 4.1.0软件进行河流断面容量分析。分析结果表明,在Sokong河段发生的q25为131.32 m3/s,模拟结果采用Hec-RAS 4.1.0软件。显示梭kong河段的容量无法容纳q25号。因此,有必要通过提高建筑的标高,使其免受洪水淹没的方式来规划Sokong河沿岸地区的住宅建筑布置。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信