Improving time management in the South African construction industry

A. Talukhaba, E. Acheampong, C. Miruka
{"title":"Improving time management in the South African construction industry","authors":"A. Talukhaba, E. Acheampong, C. Miruka","doi":"10.1504/IJDSRM.2010.037490","DOIUrl":null,"url":null,"abstract":"This paper aims to prioritise constraints to effective time management in the South African construction industry. Construction time is a basis for evaluating the success of a project and the efficiency of the project organisation. The study was limited to views expressed by registered members of the CIOB-South Africa in the Gauteng Province. The data was analysed using multi-attribute methods, content analysis and bi-variate analysis, involving rank order correlation tests. The findings of the study reveal the appropriateness of time management techniques as used by practitioners in scheduling various projects, prioritised or key constraints to effective time management, and ways of improving on-time project delivery. These findings will benefit the key role players in project development namely; clients, consultants and contractors in effective time management policy formulation and implementation.","PeriodicalId":170104,"journal":{"name":"International Journal of Decision Sciences, Risk and Management","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-12-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Decision Sciences, Risk and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/IJDSRM.2010.037490","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

This paper aims to prioritise constraints to effective time management in the South African construction industry. Construction time is a basis for evaluating the success of a project and the efficiency of the project organisation. The study was limited to views expressed by registered members of the CIOB-South Africa in the Gauteng Province. The data was analysed using multi-attribute methods, content analysis and bi-variate analysis, involving rank order correlation tests. The findings of the study reveal the appropriateness of time management techniques as used by practitioners in scheduling various projects, prioritised or key constraints to effective time management, and ways of improving on-time project delivery. These findings will benefit the key role players in project development namely; clients, consultants and contractors in effective time management policy formulation and implementation.
改善南非建筑业的时间管理
本文旨在优先考虑南非建筑业有效时间管理的限制。施工时间是评价项目成功与否和项目组织效率的基础。这项研究仅限于豪登省ciob -南非注册会员所表达的意见。采用多属性方法、内容分析和双变量分析对数据进行分析,包括秩序相关检验。研究结果揭示了从业者在安排各种项目时使用的时间管理技术的适当性,有效时间管理的优先级或关键约束,以及改进按时项目交付的方法。这些研究结果将有利于项目发展的主要角色,即:协助客户、顾问及承办商制定及执行有效的时间管理政策。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信