{"title":"Underground Development - Pipe Curtain with Jack-in-place Rectangular Tunnel Boring Machine Technology","authors":"Zhang Zhen, K. Chiang, L. Mañ","doi":"10.21467/proceedings.133.17","DOIUrl":null,"url":null,"abstract":"With the recent successful application of Rectangular Tunnel Boring Machine (RTBM) Jack-in place technology in Hong Kong, more interest is put into its wider use. However, the application of RTBM is restrained by geological limitations, such as shallow overburden depth, limited span depth ratio of the tunnel (< 2), etc. Advanced underground construction technology – the adoption of systematic pipe curtain with Jack-in place RTBM methodology- was introduced recently in China and Overseas to construct underground railway tunnels, stations, pedestrian subways, and underpass in challenging congested urban areas. This advanced methodology focuses on underground structures construction in which stringent settlement control with shallow overburden cover is required. It also possesses the flexibility to adapt to different sizes of cross-sections, which makes wide span (>20m) underground structures can be constructed by the trenchless method. Given the future of Hong Kong infrastructure development, this paper is aimed to explore the potential for developing underground space based on this advanced solution to resolving problems in an old and congested urban area. Taking past successful project experiences in Mainland China as examples, this paper has discussed the geological requirements, construction method, sequence, ground settlement performance, etc. It also provides consideration that should be aware of the adoption of technology in typical Hong Kong geological conditions. The RTBM technology offers a new solution to the infrastructure development projects in Hong Kong with better buildability, safety and productivity.","PeriodicalId":379153,"journal":{"name":"Proceedings of The HKIE Geotechnical Division 42nd Annual Seminar: A New Era of Metropolis and Infrastructure Developments in Hong Kong, Challenges and Opportunities to Geotechnical Engineering","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-09-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of The HKIE Geotechnical Division 42nd Annual Seminar: A New Era of Metropolis and Infrastructure Developments in Hong Kong, Challenges and Opportunities to Geotechnical Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21467/proceedings.133.17","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

With the recent successful application of Rectangular Tunnel Boring Machine (RTBM) Jack-in place technology in Hong Kong, more interest is put into its wider use. However, the application of RTBM is restrained by geological limitations, such as shallow overburden depth, limited span depth ratio of the tunnel (< 2), etc. Advanced underground construction technology – the adoption of systematic pipe curtain with Jack-in place RTBM methodology- was introduced recently in China and Overseas to construct underground railway tunnels, stations, pedestrian subways, and underpass in challenging congested urban areas. This advanced methodology focuses on underground structures construction in which stringent settlement control with shallow overburden cover is required. It also possesses the flexibility to adapt to different sizes of cross-sections, which makes wide span (>20m) underground structures can be constructed by the trenchless method. Given the future of Hong Kong infrastructure development, this paper is aimed to explore the potential for developing underground space based on this advanced solution to resolving problems in an old and congested urban area. Taking past successful project experiences in Mainland China as examples, this paper has discussed the geological requirements, construction method, sequence, ground settlement performance, etc. It also provides consideration that should be aware of the adoption of technology in typical Hong Kong geological conditions. The RTBM technology offers a new solution to the infrastructure development projects in Hong Kong with better buildability, safety and productivity.
地下开发-管幕与矩形隧道钻孔机技术
随着矩形隧道掘进机(RTBM)原位技术在香港的成功应用,人们对其更广泛的应用越来越感兴趣。然而,RTBM的应用受到地质条件的限制,如覆盖层深度浅、隧道的有限跨深比(< 2)等。近年来,先进的地下施工技术——采用系统的管幕和千孔就地RTBM方法——被引入国内外,用于在具有挑战性的拥挤城市地区建造地下铁路隧道、车站、行人地铁和地下通道。这种先进的方法侧重于地下结构施工,其中需要严格控制浅覆盖层的沉降。它还具有适应不同截面尺寸的灵活性,这使得大跨度(bb0 ~ 20m)的地下结构可以采用非开挖法施工。考虑到香港未来的基础设施发展,本文旨在探讨基于这种先进的解决方案开发地下空间的潜力,以解决旧而拥挤的市区的问题。本文以中国大陆以往成功的工程经验为例,对其地质要求、施工方法、顺序、地面沉降性能等进行了探讨。它也提供了在香港典型地质条件下采用技术时应注意的考虑。RTBM技术为香港的基建发展项目提供了一个全新的解决方案,可建造性、安全性和生产力都更高。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信