Look ahead batching to minimize earliness/tardiness measures in batch processes

A. Gupta, A. I. Sivakumar, V. Ganesan
{"title":"Look ahead batching to minimize earliness/tardiness measures in batch processes","authors":"A. Gupta, A. I. Sivakumar, V. Ganesan","doi":"10.1109/RAMECH.2004.1438073","DOIUrl":null,"url":null,"abstract":"Scheduling problems involving earliness/tardiness (E/T) measures have received significant attention in recent years. This type of problem became important with the advent of the just-in-time (JIT) manufacturing philosophy, where early or tardy deliveries are highly discouraged. In this paper we examine the single batch processing machine-scheduling problem in a dynamic environment for minimizing the E/T measures. We propose a look ahead batching (LAB) method where the scheduling decisions are made considering the arrival epochs and due dates of incoming lots, which are easily predictable in a computer integrated manufacturing environment, especially in the semiconductor industry. The results of the proposed method are compared with the dynamic batching heuristic (DBH) and next arrival control heuristic (NACH), which are look ahead strategies developed based on arrival information alone. The E/T performance is measured by minimization of the absolute sum of earliness and tardiness of the lots (|E|+|T|) and the minimization of their square sum (E/sup 2/+T/sup 2/). The steady state simulation results show that exploiting the knowledge of future arrivals and their due dates leads to a significant reduction in the E/T measures for tight and loose due date settings at two different utilization levels.","PeriodicalId":252964,"journal":{"name":"IEEE Conference on Robotics, Automation and Mechatronics, 2004.","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2004-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Conference on Robotics, Automation and Mechatronics, 2004.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/RAMECH.2004.1438073","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

Abstract

Scheduling problems involving earliness/tardiness (E/T) measures have received significant attention in recent years. This type of problem became important with the advent of the just-in-time (JIT) manufacturing philosophy, where early or tardy deliveries are highly discouraged. In this paper we examine the single batch processing machine-scheduling problem in a dynamic environment for minimizing the E/T measures. We propose a look ahead batching (LAB) method where the scheduling decisions are made considering the arrival epochs and due dates of incoming lots, which are easily predictable in a computer integrated manufacturing environment, especially in the semiconductor industry. The results of the proposed method are compared with the dynamic batching heuristic (DBH) and next arrival control heuristic (NACH), which are look ahead strategies developed based on arrival information alone. The E/T performance is measured by minimization of the absolute sum of earliness and tardiness of the lots (|E|+|T|) and the minimization of their square sum (E/sup 2/+T/sup 2/). The steady state simulation results show that exploiting the knowledge of future arrivals and their due dates leads to a significant reduction in the E/T measures for tight and loose due date settings at two different utilization levels.
提前批处理,尽量减少批处理过程中的提前/延迟措施
近年来,涉及早/迟(E/T)措施的调度问题受到了极大的关注。随着准时制(JIT)制造理念的出现,这种类型的问题变得非常重要,提前或延迟交付是非常不受鼓励的。本文研究了动态环境下的单批加工机器调度问题,以最小化E/T措施。我们提出了一种预先分批(LAB)方法,其中调度决策是考虑到到货时间和到货日期,这在计算机集成制造环境中很容易预测,特别是在半导体行业。将该方法与仅基于到达信息的前瞻策略——动态批处理启发式算法(DBH)和下一到达控制启发式算法(NACH)进行了比较。E/T性能是通过最小化提前和延迟的绝对总和(|E|+|T|)和最小化它们的平方和(E/sup 2/+T/sup 2/)来衡量的。稳态仿真结果表明,在两种不同的利用水平下,利用未来到达和到期日的知识可以显著减少严格和宽松到期日设置下的E/T措施。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信