Stepwise Restoration of Power Distribution Network under Cold Load Pickup

V. Kumar, Rajesh K. Gupta, H. Gupta
{"title":"Stepwise Restoration of Power Distribution Network under Cold Load Pickup","authors":"V. Kumar, Rajesh K. Gupta, H. Gupta","doi":"10.1109/PEDES.2006.344319","DOIUrl":null,"url":null,"abstract":"This paper presents a scheme for step-by-step restoration of a power distribution network under cold load pickup condition. The proposed scheme uses the optimal load shedding for each step of the restoration process, and determines the optimal switching sequence for the restoration process. The optimization is performed to achieve multiple objectives of minimum load curtailment and minimum switching operations while satisfying all the system constraints. Genetic algorithm has been utilized to search the optimal solution. The scheme has been illustrated on a standard 33-bus radial distribution network.","PeriodicalId":262597,"journal":{"name":"2006 International Conference on Power Electronic, Drives and Energy Systems","volume":"546 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2006 International Conference on Power Electronic, Drives and Energy Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PEDES.2006.344319","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 8

Abstract

This paper presents a scheme for step-by-step restoration of a power distribution network under cold load pickup condition. The proposed scheme uses the optimal load shedding for each step of the restoration process, and determines the optimal switching sequence for the restoration process. The optimization is performed to achieve multiple objectives of minimum load curtailment and minimum switching operations while satisfying all the system constraints. Genetic algorithm has been utilized to search the optimal solution. The scheme has been illustrated on a standard 33-bus radial distribution network.
冷负荷取电下配电网的逐步恢复
提出了一种配电网在冷负荷接机条件下的分步恢复方案。该方案对恢复过程的每一步采用最优减载,并确定恢复过程的最优切换顺序。在满足系统所有约束条件的情况下,以实现最小的负荷削减和最小的切换操作为目标进行优化。利用遗传算法来搜索最优解。该方案已在一个标准的33总线径向配电网上进行了说明。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信