Structural Alternatives in Procurement of Gazprom Infrastructure Projects

L. Plekhanova, A. E. Shpilevaya
{"title":"Structural Alternatives in Procurement of Gazprom Infrastructure Projects","authors":"L. Plekhanova, A. E. Shpilevaya","doi":"10.38050/2078-3809-2020-12-4-88-116","DOIUrl":null,"url":null,"abstract":" The paper analyzes structural alternatives in the implementation of infrastructure projects on the example of main gas pipelines. Particular attention is paid to the impact of various forms of procurement procedures on the course and result of the implementation of the infrastructure project as a whole. It is shown that the choice of procurement method can influence the structure of incentives and risks of the parties involved, as well as indirectly impact on the establishment of the market price setting, the level of product quality in the industry, and the complex cost of project implementation. Noting the extreme importance of the issues of ensuring the quality of the products used, the authors review the available structural alternatives for organizing quality control, show the possible mechanisms of the influence of the downtime of enterprises on reducing the level of industry competencies.","PeriodicalId":290417,"journal":{"name":"Scientific Research of Faculty of Economics. Electronic Journal","volume":"87 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Scientific Research of Faculty of Economics. Electronic Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.38050/2078-3809-2020-12-4-88-116","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

 The paper analyzes structural alternatives in the implementation of infrastructure projects on the example of main gas pipelines. Particular attention is paid to the impact of various forms of procurement procedures on the course and result of the implementation of the infrastructure project as a whole. It is shown that the choice of procurement method can influence the structure of incentives and risks of the parties involved, as well as indirectly impact on the establishment of the market price setting, the level of product quality in the industry, and the complex cost of project implementation. Noting the extreme importance of the issues of ensuring the quality of the products used, the authors review the available structural alternatives for organizing quality control, show the possible mechanisms of the influence of the downtime of enterprises on reducing the level of industry competencies.
俄罗斯天然气工业股份公司基础设施项目采购中的结构性选择
本文以天然气主干管道为例,分析了基础设施工程实施中的结构选择。特别注意各种形式的采购程序对整个基础设施项目实施过程和结果的影响。研究表明,采购方式的选择会影响各方的激励结构和风险,并间接影响市场价格设定的建立、行业产品质量水平和项目实施的复杂成本。注意到确保所用产品质量问题的极端重要性,提交人审查了组织质量控制的现有结构性替代方案,展示了企业停工对降低行业竞争力水平的影响的可能机制。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信