{"title":"A probabilistic technique for the evaluation of transient recovery voltages across circuit breakers of series capacitor compensated transmission lines","authors":"S. Faried, S. Aboreshaid","doi":"10.1109/ICPST.2000.897134","DOIUrl":null,"url":null,"abstract":"This paper presents a Monte Carlo based approach to evaluate of the maximum transient recovery voltages induced across circuit breaker poles during clearing a fault on a series capacitor compensated transmission line. In this context, investigations have been conducted on a sample power system model taking into consideration the uncertainty of several factors associated with the practical operation of a power system. A risk index that reflects the likelihood that the transient recovery voltage induced across a circuit breaker poles exceeds its design value is also presented.","PeriodicalId":330989,"journal":{"name":"PowerCon 2000. 2000 International Conference on Power System Technology. Proceedings (Cat. No.00EX409)","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2000-12-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"PowerCon 2000. 2000 International Conference on Power System Technology. Proceedings (Cat. No.00EX409)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICPST.2000.897134","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
This paper presents a Monte Carlo based approach to evaluate of the maximum transient recovery voltages induced across circuit breaker poles during clearing a fault on a series capacitor compensated transmission line. In this context, investigations have been conducted on a sample power system model taking into consideration the uncertainty of several factors associated with the practical operation of a power system. A risk index that reflects the likelihood that the transient recovery voltage induced across a circuit breaker poles exceeds its design value is also presented.