{"title":"Production Management Information System","authors":"J. Reitman, Thomas J. Burke","doi":"10.1109/TSSC.1968.300170","DOIUrl":null,"url":null,"abstract":"A Management Information System has been developed and implemented using General Purpose Simulation System (GPSS)/360. The system provided the following data for a solid-state production facility: 1) current location of wafers showing work orders started, total daily production, and rejects; 2) yesterday's and accumulated yield by step, and projection of number of finished wafers from this quantity; 3) location of dormant work orders, i.e., orders that had not moved for a specified time; 4) current utilization of equipment and manpower; 5) number of orders awaiting processing at each step and how long they have been waiting; 6) daily operations schedule of wafers to be processed each day according to a predetermined priority structure; and 7) delivery forecast for when orders would be shipped and how the date varies according to resources applied. The inventory status data were structured in GPSS/360 to provide a common data format for both current status and forecasting. This fully operational system was developed to satisfy specific solid-state management requirements. This system was organized in a general manner for flexibility and change and could be modified to be used as a management information system for other types of operations.","PeriodicalId":120916,"journal":{"name":"IEEE Trans. Syst. Sci. Cybern.","volume":"4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1968-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Trans. Syst. Sci. Cybern.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TSSC.1968.300170","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6
Abstract
A Management Information System has been developed and implemented using General Purpose Simulation System (GPSS)/360. The system provided the following data for a solid-state production facility: 1) current location of wafers showing work orders started, total daily production, and rejects; 2) yesterday's and accumulated yield by step, and projection of number of finished wafers from this quantity; 3) location of dormant work orders, i.e., orders that had not moved for a specified time; 4) current utilization of equipment and manpower; 5) number of orders awaiting processing at each step and how long they have been waiting; 6) daily operations schedule of wafers to be processed each day according to a predetermined priority structure; and 7) delivery forecast for when orders would be shipped and how the date varies according to resources applied. The inventory status data were structured in GPSS/360 to provide a common data format for both current status and forecasting. This fully operational system was developed to satisfy specific solid-state management requirements. This system was organized in a general manner for flexibility and change and could be modified to be used as a management information system for other types of operations.