{"title":"Analysis of flicker mitigation in a utility distribution network","authors":"B. Blazic, I. Papič","doi":"10.1109/EURCON.2003.1248202","DOIUrl":null,"url":null,"abstract":"A regional utility company in Slovenia reported excessive flicker levels that are caused mainly by a 4 MVA arc furnace installed in the area. This paper evaluates two possible solutions for flicker mitigation: increasing the short-circuit power at the point of common coupling; and installation of a D-StatCom system. Based on the field measurements, a detailed network model was constructed in the PSCAD/EMTDC program to verify the proposed solutions. The arc furnace and an IEC flicker-meter for flicker level evaluations were also modeled. A comprising solution to flicker mitigation was analyzed. The utility could reduce the flicker level from 4 to around 1.9 by replacing its HV/MV transformer. Further reduction of flicker (the permissible level is set to 1) should be done by the customer with the application of a D-StatCom compensation system. The structure and control of the device are proposed in this paper.","PeriodicalId":337983,"journal":{"name":"The IEEE Region 8 EUROCON 2003. Computer as a Tool.","volume":"2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2003-12-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"18","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The IEEE Region 8 EUROCON 2003. Computer as a Tool.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EURCON.2003.1248202","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 18
Abstract
A regional utility company in Slovenia reported excessive flicker levels that are caused mainly by a 4 MVA arc furnace installed in the area. This paper evaluates two possible solutions for flicker mitigation: increasing the short-circuit power at the point of common coupling; and installation of a D-StatCom system. Based on the field measurements, a detailed network model was constructed in the PSCAD/EMTDC program to verify the proposed solutions. The arc furnace and an IEC flicker-meter for flicker level evaluations were also modeled. A comprising solution to flicker mitigation was analyzed. The utility could reduce the flicker level from 4 to around 1.9 by replacing its HV/MV transformer. Further reduction of flicker (the permissible level is set to 1) should be done by the customer with the application of a D-StatCom compensation system. The structure and control of the device are proposed in this paper.