A Review of BIM based Inventory Management Workflow and Techniques

Aditya Mahajan, Anil Kumar Chilakapati
{"title":"A Review of BIM based Inventory Management Workflow and Techniques","authors":"Aditya Mahajan, Anil Kumar Chilakapati","doi":"10.51983/tarce-2023.12.1.3584","DOIUrl":null,"url":null,"abstract":"The main objective of material management is to strategically plan the usage of materials, which is crucial for the construction sector. When producing material managing with the goal of fulfilling the demands of production and building. Materials should be kept to a minimum, and the amount of capital should be decreased. in order to choose the best manufacturing scenario and manage the inventory efficiently. In this situation, simulation offers a suitable method for quickly testing suggested scenarios. Building information modelling (BIM) offers a practical and comprehensive way of exchanging data among various contexts, which is necessary for simulation models. Thus, the information extrapolated from the BIM model is used in this study to propose a mix of discrete-event and continuous simulation that simplifies inventory management for large scale construction. This strategy creates a schedule and guarantees consistency and efficiency of the workflow. This research will provide a brief overview of the inventory management process in order to give some insight into why these techniques are so necessary. We’ll also talk about various ways that inventories can be managed and review some of the popular BIM-based RDBMS systems (Relational Database Management System) on the market. The compression of different types of inventory management workflow concludes that a more efficient work process, increased activity, and less input time and burden compared to a management system without BIM. These results showed that construction project management performed better under the suggested BIM-based approach.","PeriodicalId":437898,"journal":{"name":"The Asian Review of Civil Engineering","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-05-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Asian Review of Civil Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.51983/tarce-2023.12.1.3584","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The main objective of material management is to strategically plan the usage of materials, which is crucial for the construction sector. When producing material managing with the goal of fulfilling the demands of production and building. Materials should be kept to a minimum, and the amount of capital should be decreased. in order to choose the best manufacturing scenario and manage the inventory efficiently. In this situation, simulation offers a suitable method for quickly testing suggested scenarios. Building information modelling (BIM) offers a practical and comprehensive way of exchanging data among various contexts, which is necessary for simulation models. Thus, the information extrapolated from the BIM model is used in this study to propose a mix of discrete-event and continuous simulation that simplifies inventory management for large scale construction. This strategy creates a schedule and guarantees consistency and efficiency of the workflow. This research will provide a brief overview of the inventory management process in order to give some insight into why these techniques are so necessary. We’ll also talk about various ways that inventories can be managed and review some of the popular BIM-based RDBMS systems (Relational Database Management System) on the market. The compression of different types of inventory management workflow concludes that a more efficient work process, increased activity, and less input time and burden compared to a management system without BIM. These results showed that construction project management performed better under the suggested BIM-based approach.
基于BIM的库存管理工作流程和技术综述
材料管理的主要目标是战略性地规划材料的使用,这对建筑部门至关重要。在生产物料管理时,以满足生产和建筑的需求为目标。材料应保持在最低限度,资金应减少。为了选择最佳的制造方案,有效地管理库存。在这种情况下,模拟为快速测试建议的场景提供了一种合适的方法。建筑信息模型(BIM)提供了一种实用而全面的方式在各种环境之间交换数据,这是仿真模型所必需的。因此,本研究使用了从BIM模型中推断出的信息,提出了一种离散事件和连续模拟的混合方法,简化了大规模施工的库存管理。该策略创建了一个时间表,并保证了工作流的一致性和效率。本研究将简要概述库存管理过程,以便深入了解为什么这些技术是如此必要。我们还将讨论管理库存的各种方法,并回顾市场上一些流行的基于bim的RDBMS系统(关系数据库管理系统)。不同类型的库存管理工作流程的压缩得出的结论是,与没有BIM的管理系统相比,更有效的工作流程,增加了活动,减少了输入时间和负担。这些结果表明,在基于bim的方法下,建设项目管理表现更好。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信