{"title":"Input Delay Compensation with Digital Redesigned A/D Conversion","authors":"Yongpeng Zhang, C. Akujuobi, A. Ajuzie, Chao Xia","doi":"10.1109/RAMECH.2008.4681391","DOIUrl":null,"url":null,"abstract":"Network controlled system will always experience some delays in communications, and how to improve its stability is of great importance for industry applications. In this paper, one novel method of delay compensation by utilizing digital redesign is proposed. First, analog controller is designed for the delay free system, and then the delay compensation algorithm is modulated through A/D conversion. In addition, this method can deal with delay variations by adjusting PAM controller period. The proposed methodologies have been testified through MATLAB/Simulink, and the simulation results effectively confirmed its theoretical correctness.","PeriodicalId":320560,"journal":{"name":"2008 IEEE Conference on Robotics, Automation and Mechatronics","volume":"50 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-11-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 IEEE Conference on Robotics, Automation and Mechatronics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/RAMECH.2008.4681391","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3
Abstract
Network controlled system will always experience some delays in communications, and how to improve its stability is of great importance for industry applications. In this paper, one novel method of delay compensation by utilizing digital redesign is proposed. First, analog controller is designed for the delay free system, and then the delay compensation algorithm is modulated through A/D conversion. In addition, this method can deal with delay variations by adjusting PAM controller period. The proposed methodologies have been testified through MATLAB/Simulink, and the simulation results effectively confirmed its theoretical correctness.