Analisis Pengaruh Faktor Dominan Terhadap Kinerja Kontrak Pelaksanaan Konstruksi Jaringan Transmisi dari Aspek Biaya, Waktu dan Mutu

Wenny Rosdiana, S. Sutardi
{"title":"Analisis Pengaruh Faktor Dominan Terhadap Kinerja Kontrak Pelaksanaan Konstruksi Jaringan Transmisi dari Aspek Biaya, Waktu dan Mutu","authors":"Wenny Rosdiana, S. Sutardi","doi":"10.25105/cesd.v4i2.10379","DOIUrl":null,"url":null,"abstract":"The construction of 150 SUTT Transmission Line Jatigede Incomer is located in Sumedang Regency, West Java. The problems that exist in this project are: (1.) Procurement of Materials, (2.) Land acquisition, (3.) Design Changes, and (4.) The Covid-19 pandemic. As a result of these problems, the project was delayed and required an extension of 442 days (245% of the initial contract which was only 180 days) and 4.89% additional cost of the initial contract. This research aims to study the efforts in order to improve contract performance from cost, time and quality aspects. The analysis was carried out using the method of fishbone diagram analysis for two conditions, which were the initial conditions and its improvement efforts in terms of cost, time and quality, while the concept of earned value was to determine the dominant factor that caused the increase in costs and time. From the results of the analysis, it can be said that the dominant factor that affects the increase in costs is design changes which is 95% of the total amendment cost and causes an extension time of 73% of the total additional time for contract amendments. The impact of the covid-19 pandemic which resulted in the termination of the project for approximately 120 days was the dominant factor in the contract amendment (approximately 27% of 442 days). Regarding problems related to material procurement, it only causes 1.36% additional cost of the total cost amendment, which caused by transportation costs. Land acquisition carried out in stages does not result in additional time or additional contract costs. The quality of the foundation and tower structure work can be maintained in accordance with the requirements in the contract.","PeriodicalId":103613,"journal":{"name":"INDONESIAN JOURNAL OF CONSTRUCTION ENGINEERING AND SUSTAINABLE DEVELOPMENT (CESD)","volume":"16 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-12-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"INDONESIAN JOURNAL OF CONSTRUCTION ENGINEERING AND SUSTAINABLE DEVELOPMENT (CESD)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25105/cesd.v4i2.10379","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The construction of 150 SUTT Transmission Line Jatigede Incomer is located in Sumedang Regency, West Java. The problems that exist in this project are: (1.) Procurement of Materials, (2.) Land acquisition, (3.) Design Changes, and (4.) The Covid-19 pandemic. As a result of these problems, the project was delayed and required an extension of 442 days (245% of the initial contract which was only 180 days) and 4.89% additional cost of the initial contract. This research aims to study the efforts in order to improve contract performance from cost, time and quality aspects. The analysis was carried out using the method of fishbone diagram analysis for two conditions, which were the initial conditions and its improvement efforts in terms of cost, time and quality, while the concept of earned value was to determine the dominant factor that caused the increase in costs and time. From the results of the analysis, it can be said that the dominant factor that affects the increase in costs is design changes which is 95% of the total amendment cost and causes an extension time of 73% of the total additional time for contract amendments. The impact of the covid-19 pandemic which resulted in the termination of the project for approximately 120 days was the dominant factor in the contract amendment (approximately 27% of 442 days). Regarding problems related to material procurement, it only causes 1.36% additional cost of the total cost amendment, which caused by transportation costs. Land acquisition carried out in stages does not result in additional time or additional contract costs. The quality of the foundation and tower structure work can be maintained in accordance with the requirements in the contract.
分析生产过程的成本、时间和质量方面传输线建设绩效的总体影响
150 SUTT输电线路Jatigede进站位于西爪哇省Sumedang县。本项目存在的问题有:(1)。材料采购(2)土地征用,(3)设计变更和(4)Covid-19大流行。由于这些问题,该项目被推迟,需要延长442天(仅180天的初始合同的245%)和初始合同费用的4.89%。本研究旨在从成本、时间和质量三个方面探讨提高合同绩效的努力。采用鱼骨图分析的方法对初始条件及其在成本、时间和质量方面的改进努力进行分析,而挣值的概念是确定导致成本和时间增加的主导因素。从分析结果可以看出,影响成本增加的主要因素是设计变更,设计变更占总修改成本的95%,导致合同修改额外时间的延长时间占总修改额外时间的73%。covid-19大流行的影响导致项目终止约120天,这是合同修订的主要因素(约占442天的27%)。关于材料采购方面的问题,只造成了总成本修正中1.36%的额外费用,这是由于运输成本造成的。分阶段征地不会造成额外的时间或额外的合同费用。基础及塔结构工程质量可按合同要求保持。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信