{"title":"Recovery Period of Fluvial Sediment Transport after a Major Earthquake","authors":"G. Lin, H. Kuo","doi":"10.31031/ACET.2018.01.000514","DOIUrl":null,"url":null,"abstract":"Fluvial sediment transport reflects the rate of geomorphic change in river catchment. By retrospection long-term observation data of fluvial sediment, the recovery period of sediment transport after a large earthquake can be assessed. We proved that the recovery period in a given catchment is positively correlated with the peak ground motions triggered by an earthquake. The correlation indicates that a recovery period of more than four years is required if a catchment is affected by an earthquake with a ground acceleration greater than 400gal. Major earthquake is an important factor for sediment yield, especially within a few years after a large earthquake. Therefore, within a few years after a major earthquake, fast geomorphic change in river catchment should be considered as one of environmental conditions for engineering and natural-disaster prevention work.","PeriodicalId":163364,"journal":{"name":"Advancements in Civil Engineering & Technology","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-06-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Advancements in Civil Engineering & Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31031/ACET.2018.01.000514","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Fluvial sediment transport reflects the rate of geomorphic change in river catchment. By retrospection long-term observation data of fluvial sediment, the recovery period of sediment transport after a large earthquake can be assessed. We proved that the recovery period in a given catchment is positively correlated with the peak ground motions triggered by an earthquake. The correlation indicates that a recovery period of more than four years is required if a catchment is affected by an earthquake with a ground acceleration greater than 400gal. Major earthquake is an important factor for sediment yield, especially within a few years after a large earthquake. Therefore, within a few years after a major earthquake, fast geomorphic change in river catchment should be considered as one of environmental conditions for engineering and natural-disaster prevention work.