Vehicular Analysis of a Bridge Structure Considering IRC Loading Condition using Sap 2000

N. Singh, Jyoti Yadav
{"title":"Vehicular Analysis of a Bridge Structure Considering IRC Loading Condition using Sap 2000","authors":"N. Singh, Jyoti Yadav","doi":"10.24113/ijoscience.v7i11.420","DOIUrl":null,"url":null,"abstract":"A beam bridge is a bridge that uses struts as a method of supporting the deck. A bridge consists of three sections: the foundation consisting of protrusions and supports and the substructure consisting of protrusions and quay and the superstructure (bracing, cantilever or curve) and the deck. A beam bridge is probably the most manufactured and used bridge on the planet. Its basic plant, at its best, can be likened to a tree trunk extending to one side to alternate across a stream or river. All decks consist of two main parts: the substructure and the superstructure. The superstructure is everything from the support cushions to - it's the thing that supports the posts and it's the most distinctive part of the deck. The substructure is the device that exchanges the poles of the superstructure on the ground. The two sections must work together to form a strong and durable bridge. Prestressed concrete is basically concrete where the internal concern is reasonable and the pressure propagation created by the external load is concentrated to the desired extent. In this research, we analyze a beam bridge with the effect of prestressed concrete and compare it to a generic deck bridge. Regarding the finite element analysis, the analysis of forces and costs. Here it is concluded that the implementation of a prestressed ceiling results in an economical, stable and load-resistant element.","PeriodicalId":429424,"journal":{"name":"SMART MOVES JOURNAL IJOSCIENCE","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-11-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"SMART MOVES JOURNAL IJOSCIENCE","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24113/ijoscience.v7i11.420","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

A beam bridge is a bridge that uses struts as a method of supporting the deck. A bridge consists of three sections: the foundation consisting of protrusions and supports and the substructure consisting of protrusions and quay and the superstructure (bracing, cantilever or curve) and the deck. A beam bridge is probably the most manufactured and used bridge on the planet. Its basic plant, at its best, can be likened to a tree trunk extending to one side to alternate across a stream or river. All decks consist of two main parts: the substructure and the superstructure. The superstructure is everything from the support cushions to - it's the thing that supports the posts and it's the most distinctive part of the deck. The substructure is the device that exchanges the poles of the superstructure on the ground. The two sections must work together to form a strong and durable bridge. Prestressed concrete is basically concrete where the internal concern is reasonable and the pressure propagation created by the external load is concentrated to the desired extent. In this research, we analyze a beam bridge with the effect of prestressed concrete and compare it to a generic deck bridge. Regarding the finite element analysis, the analysis of forces and costs. Here it is concluded that the implementation of a prestressed ceiling results in an economical, stable and load-resistant element.
考虑IRC荷载条件的桥梁结构车辆分析
梁桥是一种用支柱支撑桥面的桥。一座桥由三部分组成:由突出部分和支撑物组成的基础、由突出部分和码头组成的下部结构、上部结构(支撑、悬臂或曲线)和桥面。梁桥可能是地球上制造和使用最多的桥梁。它的基本植物,在最好的情况下,可以被比作一根向一边伸展的树干,交替地穿过溪流或河流。所有甲板由两个主要部分组成:下层结构和上层结构。上层建筑是所有东西,从支撑垫到支撑柱子,它是甲板上最独特的部分。下部结构是在地面上交换上部结构的极点的装置。这两部分必须共同努力,形成一座坚固耐用的桥梁。预应力混凝土基本上是内部关注合理,外部荷载产生的压力传播集中到理想程度的混凝土。本文对预应力混凝土作用下的梁桥进行了分析,并与普通桥面桥进行了比较。对于有限元分析,进行力和成本的分析。这里的结论是,预应力吊顶的实施产生了一个经济、稳定和耐载荷的单元。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信