Project status accuracy in large-scale software projects

Ciprian-Leontin Stanciu
{"title":"Project status accuracy in large-scale software projects","authors":"Ciprian-Leontin Stanciu","doi":"10.1109/SACI.2011.5873002","DOIUrl":null,"url":null,"abstract":"Elaborating the project status for large-scale software projects is a very important task of the project manager due to the high need of control of such projects. Depending on the strategy used for elaborating the project status, the project manager has more or less information that they can further use in their decision-making process. In this paper we propose a classification of project status accuracy and we discuss the decisions that underlay the selection of a particular accuracy level for elaborating the status of a managed project.","PeriodicalId":334381,"journal":{"name":"2011 6th IEEE International Symposium on Applied Computational Intelligence and Informatics (SACI)","volume":"48 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-05-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 6th IEEE International Symposium on Applied Computational Intelligence and Informatics (SACI)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SACI.2011.5873002","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Elaborating the project status for large-scale software projects is a very important task of the project manager due to the high need of control of such projects. Depending on the strategy used for elaborating the project status, the project manager has more or less information that they can further use in their decision-making process. In this paper we propose a classification of project status accuracy and we discuss the decisions that underlay the selection of a particular accuracy level for elaborating the status of a managed project.
大型软件项目中的项目状态准确性
大型软件项目对项目控制的要求很高,对项目经理来说,掌握项目状态是一项非常重要的任务。根据用于详细说明项目状态的策略,项目经理拥有或多或少的信息,他们可以在决策过程中进一步使用这些信息。在本文中,我们提出了项目状态准确性的分类,并讨论了为详细说明管理项目的状态而选择特定精度级别的决策。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信