The Acquisition of Projects Resources in the University of Bamenda

Eyong Ako
{"title":"The Acquisition of Projects Resources in the University of Bamenda","authors":"Eyong Ako","doi":"10.56397/fms.2023.06.01","DOIUrl":null,"url":null,"abstract":"This study investigates the process of project resource acquisition under the University of Bamenda. Acquiring resources is the process of securing team members, equipment, materials or other resources required to deliver the project. Resources are people, equipment, materials, money, or anything else that the University of Bamenda needs in order to carry out all of the activities that have been planned. The University of Bamenda is public entity and therefore it follows the procurement code of Cameroon, which can bring in delays in the process due to administrative procedures. In this study we used the primary data collection technique particularly the use of interview though with limitations in the sample size. The study used descriptive statistics such as frequency tables, bar charts and pie charts in presenting the data. The study concluded that the University of Bamenda uses the public contracts procurement code to acquire material resources which are financed either by the MINESUP or by the University funds. Resources such as human are acquired by recruitment and financial resources acquired through the payment of fees (tuition and medical).","PeriodicalId":310548,"journal":{"name":"Frontiers in Management Science","volume":"77 8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Frontiers in Management Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.56397/fms.2023.06.01","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This study investigates the process of project resource acquisition under the University of Bamenda. Acquiring resources is the process of securing team members, equipment, materials or other resources required to deliver the project. Resources are people, equipment, materials, money, or anything else that the University of Bamenda needs in order to carry out all of the activities that have been planned. The University of Bamenda is public entity and therefore it follows the procurement code of Cameroon, which can bring in delays in the process due to administrative procedures. In this study we used the primary data collection technique particularly the use of interview though with limitations in the sample size. The study used descriptive statistics such as frequency tables, bar charts and pie charts in presenting the data. The study concluded that the University of Bamenda uses the public contracts procurement code to acquire material resources which are financed either by the MINESUP or by the University funds. Resources such as human are acquired by recruitment and financial resources acquired through the payment of fees (tuition and medical).
巴门达大学项目资源的获取
本研究考察巴门达大学项目资源获取过程。获取资源是确保交付项目所需的团队成员、设备、材料或其他资源的过程。资源是指巴门达大学为开展计划的所有活动所需要的人员、设备、材料、资金或其他任何东西。巴门达大学是一个公共实体,因此它遵循喀麦隆的采购守则,这可能会因行政程序而导致进程延误。在这项研究中,我们使用了主要的数据收集技术,特别是使用了访谈,尽管样本量有限。该研究使用了描述性统计数据,如频率表、条形图和饼状图来呈现数据。这项研究的结论是,巴门达大学使用公共合同采购守则来获得由矿产资源管理小组或大学基金资助的物质资源。人力等资源是通过招聘获得的,财政资源是通过支付费用(学费和医药费)获得的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信