BIM-Based Construction Progress Measurement of Non-Repetitive HVAC Installation Works

P. Dallasega, A. Revolti, Camilla Follini, Christoph Paul Schimanski, D. Matt
{"title":"BIM-Based Construction Progress Measurement of Non-Repetitive HVAC Installation Works","authors":"P. Dallasega, A. Revolti, Camilla Follini, Christoph Paul Schimanski, D. Matt","doi":"10.24928/2019/0152","DOIUrl":null,"url":null,"abstract":"Construction projects are often delivered over time and over budget. Deviations are often identified only during the finishing stages when improvement actions to recover from delays become limited. Building Information Modeling (BIM) will transform the construction industry to come in line with more digitally developed industries like manufacturing. However, up to now, BIM has been mainly used to support the information flow of the construction design process and limited effort has been invested to investigate how it could support the management of the construction execution process. The paper shows how BIM can be used to schedule and monitor non-repetitive construction tasks. The proposed approach shows how important information needed for scheduling (like the number of pieces to be installed in a certain location) could be extracted from the BIM model. Moreover, it shows how BIM could support a quantitative monitoring of the reached progress and how this information can be displayed in an intuitive way to the user. The approach was developed during the project COCkPiT (Collaborative Construction Process Management) and especially by collaborating with a Heating Ventilation and Air Conditioning (HVAC) company using as a case study a medium sized hospital construction project located in Northern Italy.","PeriodicalId":278113,"journal":{"name":"Proc. 27th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"14 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-07-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proc. 27th Annual Conference of the International Group for Lean Construction (IGLC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24928/2019/0152","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

Abstract

Construction projects are often delivered over time and over budget. Deviations are often identified only during the finishing stages when improvement actions to recover from delays become limited. Building Information Modeling (BIM) will transform the construction industry to come in line with more digitally developed industries like manufacturing. However, up to now, BIM has been mainly used to support the information flow of the construction design process and limited effort has been invested to investigate how it could support the management of the construction execution process. The paper shows how BIM can be used to schedule and monitor non-repetitive construction tasks. The proposed approach shows how important information needed for scheduling (like the number of pieces to be installed in a certain location) could be extracted from the BIM model. Moreover, it shows how BIM could support a quantitative monitoring of the reached progress and how this information can be displayed in an intuitive way to the user. The approach was developed during the project COCkPiT (Collaborative Construction Process Management) and especially by collaborating with a Heating Ventilation and Air Conditioning (HVAC) company using as a case study a medium sized hospital construction project located in Northern Italy.
基于bim的非重复暖通空调安装工程施工进度测量
建设项目经常超出时间和预算交付。偏差通常只有在完成阶段才会被识别,这时从延迟中恢复的改进行动变得有限。建筑信息模型(BIM)将改变建筑业,使其与制造业等数字化发展的行业保持一致。然而,到目前为止,BIM主要用于支持施工设计过程的信息流,在如何支持施工执行过程的管理方面投入的精力有限。本文展示了如何使用BIM来安排和监控非重复的施工任务。提出的方法显示了如何从BIM模型中提取调度所需的重要信息(如在某个位置安装的部件数量)。此外,它还展示了BIM如何支持对已达到的进度进行定量监控,以及如何以直观的方式向用户显示这些信息。该方法是在座舱项目(协同施工过程管理)期间开发的,特别是通过与暖通空调(HVAC)公司合作,将位于意大利北部的中型医院建设项目作为案例研究。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信