{"title":"Power systems analysis for unmanned offshore platform fed via a very long 13.8 kV submarine cable","authors":"Joe Letef, Saud Al-Shammari, G. Fotiou, Don E. Martin","doi":"10.1109/PCICON.2015.7435103","DOIUrl":null,"url":null,"abstract":"One of Saudi Aramco's gas exploration expansion plans consists of powering an unmanned offshore platform via a 13.8 kV submarine cable. The closest available source substation (SS) is located onshore; approximately 107 km from the platform. Power systems analyses were conducted under various loading conditions. Upon starting the 11500 HP motor, at the onshore SS, severe system voltage drops were observed. This led to a problematic voltage fluctuation at the offshore platform. The installation of a 13.8 kV shunt capacitor bank (SCB) and shunt reactor bank (SRB) at the offshore platform were initially introduced to remedy voltage control. During transient analysis, under faulty conditions adjacent to the SCB, the 13.8 kV circuit breaker (CB) will be exposed to an excessive transient recovery voltage (TRV) exceeding the limit of the 13.8 kV CB. The harmonic analysis indicated high values on the 5th, 7th and 11th harmonic voltage distortion. As a mitigation measures, the segregation of motor loads and non-motor loads at the SS eliminated the severe voltage drop. The installation of a static synchronous shunt compensator (STATCOM) at the offshore platform was also retained as it will eliminate the need for an SCB and SRB with the high TRVs and resolve the harmonic problems.","PeriodicalId":191070,"journal":{"name":"2015 IEEE Petroleum and Chemical Industry Committee Conference (PCIC)","volume":"1901 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 IEEE Petroleum and Chemical Industry Committee Conference (PCIC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PCICON.2015.7435103","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

One of Saudi Aramco's gas exploration expansion plans consists of powering an unmanned offshore platform via a 13.8 kV submarine cable. The closest available source substation (SS) is located onshore; approximately 107 km from the platform. Power systems analyses were conducted under various loading conditions. Upon starting the 11500 HP motor, at the onshore SS, severe system voltage drops were observed. This led to a problematic voltage fluctuation at the offshore platform. The installation of a 13.8 kV shunt capacitor bank (SCB) and shunt reactor bank (SRB) at the offshore platform were initially introduced to remedy voltage control. During transient analysis, under faulty conditions adjacent to the SCB, the 13.8 kV circuit breaker (CB) will be exposed to an excessive transient recovery voltage (TRV) exceeding the limit of the 13.8 kV CB. The harmonic analysis indicated high values on the 5th, 7th and 11th harmonic voltage distortion. As a mitigation measures, the segregation of motor loads and non-motor loads at the SS eliminated the severe voltage drop. The installation of a static synchronous shunt compensator (STATCOM) at the offshore platform was also retained as it will eliminate the need for an SCB and SRB with the high TRVs and resolve the harmonic problems.
通过超长13.8千伏海底电缆供电的无人海上平台电力系统分析
沙特阿美公司的天然气勘探扩张计划之一是通过13.8千伏海底电缆为无人海上平台供电。最近的可用源变电站(SS)位于陆上;距离平台约107公里。在各种负载条件下对电力系统进行了分析。在岸上SS启动11500马力的电机后,观察到严重的系统电压下降。这导致了海上平台的电压波动问题。最初在海上平台安装了13.8 kV并联电容器组(SCB)和并联电抗器组(SRB),以纠正电压控制。在暂态分析中,在靠近SCB的故障条件下,13.8 kV断路器(CB)将暴露在超过13.8 kV断路器限值的过高暂态恢复电压(TRV)下。谐波分析表明,第5次、第7次和第11次谐波电压畸变值较高。作为缓解措施,隔离电机负载和非电机负载在SS消除了严重的电压降。在海上平台上安装的静态同步并联补偿器(STATCOM)也被保留下来,因为它将消除对具有高trv的SCB和SRB的需求,并解决谐波问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信