{"title":"Acquisition of environmentally preferable products and services","authors":"Eun-Sook Goidel, J. Shoaff","doi":"10.1109/ISEE.1995.514987","DOIUrl":null,"url":null,"abstract":"The paper presents a brief narrative of EPA's approach in responding to the \"environmentally preferable products\" provisions of section 503 of Executive Order 12873. It discusses the development of a guidance for the acquisition of environmentally preferable products which recommends general principles to consider when determining environmental preferability as well as proposes implementation through product-specific pilot acquisitions. A pilot involving the federal procurement of computers is planned. The approach taken, current status and next steps for this pilot are detailed.","PeriodicalId":338075,"journal":{"name":"Proceedings of the 1995 IEEE International Symposium on Electronics and the Environment ISEE (Cat. No.95CH35718)","volume":"21 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1995-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 1995 IEEE International Symposium on Electronics and the Environment ISEE (Cat. No.95CH35718)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISEE.1995.514987","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The paper presents a brief narrative of EPA's approach in responding to the "environmentally preferable products" provisions of section 503 of Executive Order 12873. It discusses the development of a guidance for the acquisition of environmentally preferable products which recommends general principles to consider when determining environmental preferability as well as proposes implementation through product-specific pilot acquisitions. A pilot involving the federal procurement of computers is planned. The approach taken, current status and next steps for this pilot are detailed.