Components of an Effective Vegetation Management Program (2006 IEEE Rural Electric Power Conference)

P. Appelt, A. Beard
{"title":"Components of an Effective Vegetation Management Program (2006 IEEE Rural Electric Power Conference)","authors":"P. Appelt, A. Beard","doi":"10.1109/REPCON.2006.1649048","DOIUrl":null,"url":null,"abstract":"ECI has evaluated more than 150 electric utility vegetation management programs throughout the United States and internationally. Common traits were evident in those programs deemed to be successful. This paper discusses the components of a successful vegetation management program and the paths to achieving vegetation management success. Five phases of successful program development and implementation include: (1) workload quantification and strategic plans, (2) work practices and standards, (3) master plans and annual schedules, (4) contract management processes, and (5) record keeping. Specific examples of how Public Service Company of New Mexico (PNM) has implemented these phases over the past 10 years in the development of a successful vegetation management program have been included","PeriodicalId":300971,"journal":{"name":"2006 IEEE Rural Electric Power Conference","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-07-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2006 IEEE Rural Electric Power Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/REPCON.2006.1649048","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

Abstract

ECI has evaluated more than 150 electric utility vegetation management programs throughout the United States and internationally. Common traits were evident in those programs deemed to be successful. This paper discusses the components of a successful vegetation management program and the paths to achieving vegetation management success. Five phases of successful program development and implementation include: (1) workload quantification and strategic plans, (2) work practices and standards, (3) master plans and annual schedules, (4) contract management processes, and (5) record keeping. Specific examples of how Public Service Company of New Mexico (PNM) has implemented these phases over the past 10 years in the development of a successful vegetation management program have been included
有效植被管理计划的组成部分(2006年IEEE农村电力会议)
ECI已经在美国和国际上评估了150多个电力公用事业植被管理项目。在那些被认为是成功的项目中,共同的特征是显而易见的。本文讨论了一个成功的植被管理方案的组成部分和实现植被管理成功的途径。成功的计划开发和实施的五个阶段包括:(1)工作量量化和战略计划,(2)工作实践和标准,(3)总体计划和年度进度表,(4)合同管理过程,(5)记录保存。新墨西哥州公共服务公司(PNM)在过去10年中如何实施这些阶段,成功地制定了一个植被管理计划的具体例子已经包括在内
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信