Plug and Abandonment Procedures for Onshore Wells and the Utilization of Reserved Abandonment and Site Restoration ASR Funds

A. E. Prasetya, Rakhmahwidiati Rakhmahwidiati, Ronald Daniel Pangihutan Hutabarat
{"title":"Plug and Abandonment Procedures for Onshore Wells and the Utilization of Reserved Abandonment and Site Restoration ASR Funds","authors":"A. E. Prasetya, Rakhmahwidiati Rakhmahwidiati, Ronald Daniel Pangihutan Hutabarat","doi":"10.2118/193956-ms","DOIUrl":null,"url":null,"abstract":"\n Provide an overview of the procedures for abandoning onshore wells, backgrounds and technical requirements as a reference. Provide an overview of the utilization of reserved abandonment and site restoration funds to finance the abandonment of the wells.\n Plugging and abandoning the well is done when it has not more potential on productivity, has a well integrity problem, and is at risk of theft and the environment. Procedures undertaken to obtain approval for the closure of the well. The technical review of abandoning of the well refers to recognized national and international standards. Discuss some possible innovations to obtain more effective way in troubleshooting or to replace some procedures that are not possible to be followed. Reserved ASR funds disbursement procedures to pay for work. Challenges to speed up the process of disbursement of funds.\n Following standard procedures requires considerable attention and impacts on costs to be incurred. Disbursing ASR funds that have been reserved to pay for the work is not as easy as the established procedure. Several suggestions for improvements are made to speed work approval and disbursement of funds.\n Well abandonment procedures have been standardized, but submission procedures and ASR disbursement submissions are necessary for every operator to know. This paper provides an important guide for operators to submit P&A proposals and fund disbursements.","PeriodicalId":437819,"journal":{"name":"Day 1 Mon, December 03, 2018","volume":"198 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-11-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Mon, December 03, 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/193956-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Provide an overview of the procedures for abandoning onshore wells, backgrounds and technical requirements as a reference. Provide an overview of the utilization of reserved abandonment and site restoration funds to finance the abandonment of the wells. Plugging and abandoning the well is done when it has not more potential on productivity, has a well integrity problem, and is at risk of theft and the environment. Procedures undertaken to obtain approval for the closure of the well. The technical review of abandoning of the well refers to recognized national and international standards. Discuss some possible innovations to obtain more effective way in troubleshooting or to replace some procedures that are not possible to be followed. Reserved ASR funds disbursement procedures to pay for work. Challenges to speed up the process of disbursement of funds. Following standard procedures requires considerable attention and impacts on costs to be incurred. Disbursing ASR funds that have been reserved to pay for the work is not as easy as the established procedure. Several suggestions for improvements are made to speed work approval and disbursement of funds. Well abandonment procedures have been standardized, but submission procedures and ASR disbursement submissions are necessary for every operator to know. This paper provides an important guide for operators to submit P&A proposals and fund disbursements.
陆上油井的封井和弃井程序以及预留弃井和现场修复ASR资金的使用
概述放弃陆上井的程序、背景和技术要求,以供参考。概述了保留废弃和场地修复资金用于资助废弃油井的使用情况。堵井弃井是在产能没有潜力、存在井完整性问题、存在盗窃和环境风险的情况下进行的。为获得关井许可而采取的程序。弃井技术评审参照公认的国家标准和国际标准。讨论一些可能的创新,以获得更有效的故障排除方法或取代一些不可能遵循的程序。预留ASR资金支付程序,以支付工作费用。加快资金支付进程的挑战。遵循标准程序需要相当的关注和对成本的影响。支付为支付工作而预留的ASR资金并不像既定程序那样容易。提出了若干改进建议,以加快工作审批和资金支付。弃井程序已经标准化,但每个作业者都有必要了解提交程序和ASR支出提交。本文为作业者提交P&A方案和资金支出提供了重要指导。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信