Railway Brake System in Nordic Countried Application in Sweden's Challenges and Constrains

Denis Emorine
{"title":"Railway Brake System in Nordic Countried Application in Sweden's Challenges and Constrains","authors":"Denis Emorine","doi":"10.46720/7529563eb2021-mfm-003","DOIUrl":null,"url":null,"abstract":"Manufacturing train fleets for countries that have extreme weather/climatic condition is always a specific challenge, moreover when the concerned country has a huge difference itself inside. Even under such specific constraints and conditions, the train and in particular the brake system must remain reliable and available. Some simple examples: How can we (car builders) make sure that the train will still brake if ice or snow is built up on brake acting component? Or if the exhaust of brake pipe (emergency brake) is clogged by ice? If a train has failure between 2 far station (>250 km), it shall be able to run to reach the next (far) station. The presentation aims to: Present the fleet running locations, numbers and route distances, Present the requirements depending on the location (south vs north vs center Sweden), weather conditions (snowy, extremely cold)…, Overview of the specific solutions and features present to fit to the constrains: redundant AGTU for specific region, specific retardation test from brake and signaling system. We will present the real effect by examples of the snowy, extremely cold, humid climatic conditions: Pictures of a train with bogie completely hidden behind snow, Video of iced caliper moving by braking the ice (test bench) This will be just quick go through, since we plan a dedicated presentation for the winterization separately for the session in 2020. We will also present the specific feature of the brake and signaling system for Sweden: Retardation test. What is the aim? What is the historical development of it? How does it work? What are the attention compared to a performance test? What are the special solutions used for adapting the retardation test from UIC to a direct brake system?","PeriodicalId":315146,"journal":{"name":"EuroBrake 2021 Technical Programme","volume":"21 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"EuroBrake 2021 Technical Programme","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46720/7529563eb2021-mfm-003","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Manufacturing train fleets for countries that have extreme weather/climatic condition is always a specific challenge, moreover when the concerned country has a huge difference itself inside. Even under such specific constraints and conditions, the train and in particular the brake system must remain reliable and available. Some simple examples: How can we (car builders) make sure that the train will still brake if ice or snow is built up on brake acting component? Or if the exhaust of brake pipe (emergency brake) is clogged by ice? If a train has failure between 2 far station (>250 km), it shall be able to run to reach the next (far) station. The presentation aims to: Present the fleet running locations, numbers and route distances, Present the requirements depending on the location (south vs north vs center Sweden), weather conditions (snowy, extremely cold)…, Overview of the specific solutions and features present to fit to the constrains: redundant AGTU for specific region, specific retardation test from brake and signaling system. We will present the real effect by examples of the snowy, extremely cold, humid climatic conditions: Pictures of a train with bogie completely hidden behind snow, Video of iced caliper moving by braking the ice (test bench) This will be just quick go through, since we plan a dedicated presentation for the winterization separately for the session in 2020. We will also present the specific feature of the brake and signaling system for Sweden: Retardation test. What is the aim? What is the historical development of it? How does it work? What are the attention compared to a performance test? What are the special solutions used for adapting the retardation test from UIC to a direct brake system?
北欧国家铁路制动系统在瑞典应用的挑战与制约
为有极端天气/气候条件的国家制造火车车队总是一个特定的挑战,而且当有关国家内部存在巨大差异时。即使在这种特殊的约束和条件下,列车,特别是制动系统也必须保持可靠和可用。一些简单的例子:我们(汽车制造商)如何确保如果刹车部件上有冰或雪,火车仍然会刹车?或者刹车管(紧急刹车)的排气管被冰堵塞了?如果一列火车在两个远站(大约250公里)之间发生故障,它应该能够跑到下一个(远)站。演示的目的是:展示车队的运行地点、数量和路线距离,展示根据位置(瑞典南部、北部和中部)、天气条件(下雪、极冷)的要求,概述特定解决方案和特征,以适应限制:特定区域的冗余AGTU,制动和信号系统的特定延迟测试。我们将通过多雪、极冷、潮湿的气候条件的例子来展示实际效果:转车架完全隐藏在雪后的火车图片,结冰的卡尺通过制动冰移动的视频(测试台)。这将只是快速介绍,因为我们计划在2020年的会议上单独介绍防寒措施。我们还将介绍瑞典的刹车和信号系统的具体特点:减速测试。目的是什么?它的历史发展是怎样的?它是如何工作的?与性能测试相比,注意力是什么?有哪些特殊的解决方案用于将UIC的减速测试调整到直接制动系统?
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信