Establishment of hydroelectric microgrids, need of the time to resolve energy shortage problems

M. Sabir, S. Shah, Umer Habib
{"title":"Establishment of hydroelectric microgrids, need of the time to resolve energy shortage problems","authors":"M. Sabir, S. Shah, Umer Habib","doi":"10.1109/PGSRET.2017.8251794","DOIUrl":null,"url":null,"abstract":"Energy crisis is one of the main causes of poverty in third world countries that needs to be addressed to elevate economy and save environment. Pakistan, having ample amount of water resources, is suffering from acute energy crisis these days. Currently it is facing a power shortage of 4000–9000 MW depending on the varying power demand due to severity of weather conditions. The shortage is managed by load shedding of up to 18 hours in some parts of the country. This power outage makes necessary services like health, education and industry difficult to manage. COMSATS being one of the prestigious higher education institutions of Pakistan is expanding day by day and a new campus is under construction at Dhamtaur (about five kilometers from the old Mirpur campus). This article discusses the hydropower potential of Dor River that runs near these campuses and its development as microgrid hydropower project for off grid use at both COMSATS campuses. The study concludes that both these campuses will collectively utilize almost two thirds of the produced energy. The payback period of the project is less than fifteen years. The results of this study encourage the policy makers to think on developing such projects, specifically for education and health purposes where load shedding may cause irreversible damages.","PeriodicalId":336020,"journal":{"name":"2017 3rd International Conference on Power Generation Systems and Renewable Energy Technologies (PGSRET)","volume":"34 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 3rd International Conference on Power Generation Systems and Renewable Energy Technologies (PGSRET)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PGSRET.2017.8251794","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Energy crisis is one of the main causes of poverty in third world countries that needs to be addressed to elevate economy and save environment. Pakistan, having ample amount of water resources, is suffering from acute energy crisis these days. Currently it is facing a power shortage of 4000–9000 MW depending on the varying power demand due to severity of weather conditions. The shortage is managed by load shedding of up to 18 hours in some parts of the country. This power outage makes necessary services like health, education and industry difficult to manage. COMSATS being one of the prestigious higher education institutions of Pakistan is expanding day by day and a new campus is under construction at Dhamtaur (about five kilometers from the old Mirpur campus). This article discusses the hydropower potential of Dor River that runs near these campuses and its development as microgrid hydropower project for off grid use at both COMSATS campuses. The study concludes that both these campuses will collectively utilize almost two thirds of the produced energy. The payback period of the project is less than fifteen years. The results of this study encourage the policy makers to think on developing such projects, specifically for education and health purposes where load shedding may cause irreversible damages.
建立水电微电网,需要时间来解决能源短缺问题
能源危机是第三世界国家贫困的主要原因之一,需要解决这一问题以促进经济发展和保护环境。巴基斯坦拥有丰富的水资源,但目前正遭受严重的能源危机。目前,由于恶劣的天气条件,根据不同的电力需求,它面临着4000-9000兆瓦的电力短缺。电力短缺是通过该国部分地区长达18小时的断电来解决的。这次停电使得医疗、教育和工业等必要的服务难以管理。COMSATS是巴基斯坦著名的高等教育机构之一,其规模日益扩大,在Dhamtaur的新校区正在建设中(距离旧米尔普尔校区约5公里)。本文讨论了这些校园附近Dor河的水电潜力及其作为COMSATS校园离网使用的微电网水电项目的发展。研究得出的结论是,这两个校区将共同利用近三分之二的生产能源。项目投资回收期不超过15年。这项研究的结果鼓励决策者考虑开发这样的项目,特别是为了教育和健康目的,因为负荷减少可能造成不可逆转的损害。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信