{"title":"IBM Austin Electronic Card Assembly & Test Manufacturing Quality Management Process","authors":"S. Mulligan, J. Stobaugh","doi":"10.1109/IEMT.1992.639853","DOIUrl":null,"url":null,"abstract":"This paper summarizes Austin Electronic Manufacturing Quality twelve month period Specifically, it describes quality has been Management to Manufz includes the full range Yield Management, process improvement response to customer communications with highlights the busin proposed, the implementation and the results that have the changes made in the IBM Cinrd Assembly & Test (ECAJ) Management Process during the fr-om June 1991 through May 1992. how the responsibility for product transferred from Engineering cturing Management. This transfer of Quality responsibilities including defect investigation, manufacturing actions, defect elimination actions, problems, and continuous ECAT customers. This paper 3ss process strategy that was process that was utilized, been achieved to date.","PeriodicalId":403090,"journal":{"name":"Thirteenth IEEE/CHMT International Electronics Manufacturing Technology Symposium","volume":"28 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1992-09-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Thirteenth IEEE/CHMT International Electronics Manufacturing Technology Symposium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEMT.1992.639853","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
This paper summarizes Austin Electronic Manufacturing Quality twelve month period Specifically, it describes quality has been Management to Manufz includes the full range Yield Management, process improvement response to customer communications with highlights the busin proposed, the implementation and the results that have the changes made in the IBM Cinrd Assembly & Test (ECAJ) Management Process during the fr-om June 1991 through May 1992. how the responsibility for product transferred from Engineering cturing Management. This transfer of Quality responsibilities including defect investigation, manufacturing actions, defect elimination actions, problems, and continuous ECAT customers. This paper 3ss process strategy that was process that was utilized, been achieved to date.