Super-hot-runs management system

L. Lee, K. Hsieh, M. Lin, R. Luoh, A. Ling, S. Huang
{"title":"Super-hot-runs management system","authors":"L. Lee, K. Hsieh, M. Lin, R. Luoh, A. Ling, S. Huang","doi":"10.1109/ISSM.2000.993688","DOIUrl":null,"url":null,"abstract":"Our project's purpose is to reduce the cycle time of \"push lots\". Some lots must be pushed at a faster speed than normal lots. We refer to these lots as super-hot-runs. For example: If the customer's special requirements includes, pilot lot or FAB potential-lot, our project's purpose is to reduce the cycle times of \"push lots\" (Super-hot-runs, pilot, hot-lots) to ensure maximum customer satisfaction. According to our historical data, the cycle times of push lots were 1.0 days/layer before we started this project. We made a project goal : by reducing the C/T from 1.0 days/layer to 0.8 days/layer. We set the goal by analyzing the percentage of run, queue, hold. Then tuned a reasonable queue time SPEC to meet C/T target. Hold time reduction is also being dealt with in this project.","PeriodicalId":104122,"journal":{"name":"Proceedings of ISSM2000. Ninth International Symposium on Semiconductor Manufacturing (IEEE Cat. No.00CH37130)","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2000-09-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of ISSM2000. Ninth International Symposium on Semiconductor Manufacturing (IEEE Cat. No.00CH37130)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISSM.2000.993688","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

Abstract

Our project's purpose is to reduce the cycle time of "push lots". Some lots must be pushed at a faster speed than normal lots. We refer to these lots as super-hot-runs. For example: If the customer's special requirements includes, pilot lot or FAB potential-lot, our project's purpose is to reduce the cycle times of "push lots" (Super-hot-runs, pilot, hot-lots) to ensure maximum customer satisfaction. According to our historical data, the cycle times of push lots were 1.0 days/layer before we started this project. We made a project goal : by reducing the C/T from 1.0 days/layer to 0.8 days/layer. We set the goal by analyzing the percentage of run, queue, hold. Then tuned a reasonable queue time SPEC to meet C/T target. Hold time reduction is also being dealt with in this project.
超热运行管理系统
我们项目的目的是减少“推货”的周期时间。有些批次必须以比正常批次更快的速度推送。我们把这些拍品称为“超级热卖”。例如:如果客户的特殊要求包括,试制批次或FAB潜在批次,我们项目的目的是减少“推批”(超热轧、试制、热批)的周期时间,以确保最大程度的客户满意度。根据我们的历史数据,在我们开始这个项目之前,推送批次的周期是1.0天/层。我们制定了一个项目目标:将C/T从1.0天/层减少到0.8天/层。我们通过分析run, queue, hold的百分比来设定目标。然后调优合理的队列时间SPEC以满足C/T目标。减少等待时间也在这个项目中得到处理。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信