A Study on the Estimation Measure of Delay Cost on Work Zone Using the Traffic Flow Model

Yun-Sik Kim, Min-jae Lee
{"title":"A Study on the Estimation Measure of Delay Cost on Work Zone Using the Traffic Flow Model","authors":"Yun-Sik Kim, Min-jae Lee","doi":"10.6106/KJCEM.2016.17.5.120","DOIUrl":null,"url":null,"abstract":": The user cost is an important analysis item which should be considered together with life-cycle of facility, administrator cost and discount rate in LCCA for efficient asset management of SOC facilities. Especially, a significant delay cost occurs often for users in the road field due to a work zone for cleaning and maintenance, and in such case, the administrator should consider the administrator cost as well as the user cost for more rational decision making. However, the user cost has not been considered in most decision making steps until recently and relevant studies also have not been carried out actively. In this study, the methodology to estimate the user cost and delay cost required in the decision making step using the traffic flow model and the direct benefit estimation model in the traffic facility investment evaluation guideline is suggested. And, the traffic flow model was estimated on 4 national highway sections where maintenance was actually carried out in 2014 using VISSIM and, the user cost and the delay cost were estimated based on the suggested methodology. The analysis result showed that the average user cost of 17,569,000 KRW/km ×day occurred on Section A with approximately 30,000 AADT before a work zone occurred, and in case the first lane was blocked for maintenance, the delay cost of 10,193,000 KRW/km×day (158%) on average occurred additionally. The delay cost of 1,507,000 KRW/km×day (115%) and 1,985,000 KRW/km×day (119%) occurred on Sections B and D with approximately 20,000 AADT respectively and the delay cost of 262,000 KRW/km×day (105%) occurred on Section C with approximately 10,000 AADT. This result of this study was estimated based on the simulation of traffic flow model so that there is a limitation in its actual application. A study to develop a highly appropriate model using actual observation data and improve the possibility to apply it through the verification using the simulation will be necessary in future.","PeriodicalId":220018,"journal":{"name":"Korean Journal of Construction Engineering and Management","volume":"54 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Korean Journal of Construction Engineering and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.6106/KJCEM.2016.17.5.120","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

: The user cost is an important analysis item which should be considered together with life-cycle of facility, administrator cost and discount rate in LCCA for efficient asset management of SOC facilities. Especially, a significant delay cost occurs often for users in the road field due to a work zone for cleaning and maintenance, and in such case, the administrator should consider the administrator cost as well as the user cost for more rational decision making. However, the user cost has not been considered in most decision making steps until recently and relevant studies also have not been carried out actively. In this study, the methodology to estimate the user cost and delay cost required in the decision making step using the traffic flow model and the direct benefit estimation model in the traffic facility investment evaluation guideline is suggested. And, the traffic flow model was estimated on 4 national highway sections where maintenance was actually carried out in 2014 using VISSIM and, the user cost and the delay cost were estimated based on the suggested methodology. The analysis result showed that the average user cost of 17,569,000 KRW/km ×day occurred on Section A with approximately 30,000 AADT before a work zone occurred, and in case the first lane was blocked for maintenance, the delay cost of 10,193,000 KRW/km×day (158%) on average occurred additionally. The delay cost of 1,507,000 KRW/km×day (115%) and 1,985,000 KRW/km×day (119%) occurred on Sections B and D with approximately 20,000 AADT respectively and the delay cost of 262,000 KRW/km×day (105%) occurred on Section C with approximately 10,000 AADT. This result of this study was estimated based on the simulation of traffic flow model so that there is a limitation in its actual application. A study to develop a highly appropriate model using actual observation data and improve the possibility to apply it through the verification using the simulation will be necessary in future.
基于交通流模型的工作区域延误成本估算方法研究
用户成本是LCCA中与设施生命周期、管理员成本、贴现率等因素共同考虑的重要分析项目,以实现SOC设施的有效资产管理。特别是道路现场的用户由于有清洁维护的工作区域,往往会产生较大的延迟成本,在这种情况下,管理员应考虑管理员成本和用户成本,以便做出更合理的决策。然而,直到最近,在大多数决策步骤中都没有考虑到用户成本,也没有积极进行有关的研究。本文提出了基于交通流模型和直接效益估算模型的交通设施投资评价指南中决策步骤所需用户成本和延误成本的估算方法。利用VISSIM对2014年实际进行养护的4个国道路段的交通流模型进行了估算,并根据建议的方法估算了用户成本和延误成本。分析结果显示,在进入工作区域之前,在AADT约为3万辆的A路段,平均用户费用为1756.9万韩元/公里×day,如果为了维护而封锁第一条车道,平均用户费用为1019.3万韩元/公里km×day(158%)。B段和D段的延误费用分别为1507000韩元/km×day(115%)和1985000韩元/km×day (119%), C段的延误费用为262000韩元/km×day (105%), AADT约为10000。本研究的这一结果是基于交通流模型的仿真得出的,在实际应用中存在一定的局限性。未来有必要利用实际观测数据开发高度合适的模型,并通过模拟验证提高其应用的可能性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信