Evaluating Stakeholder's Level of Involvement in Project Execution Phase

Kamal Jaafar, S. M. Yusof
{"title":"Evaluating Stakeholder's Level of Involvement in Project Execution Phase","authors":"Kamal Jaafar, S. M. Yusof","doi":"10.19255/JMPM01909","DOIUrl":null,"url":null,"abstract":"The study aim is to examine the involvement level of the stakeholders during the project execution process. Stakeholders play a vital role in providing the needed resources and Ultimately they have strong influence on project success. The research intends to formulate a matrix which will reflect the list of elements which effect the project execution, type of stakeholder involved for each element, involvement level of each stakeholder which resulted in the delay of the execution, Criticality of involvement on project which will result in the output answer we are seeking the process of involvement for each stakeholder.","PeriodicalId":320094,"journal":{"name":"The Journal of Modern Project Management","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-05-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Journal of Modern Project Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.19255/JMPM01909","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

The study aim is to examine the involvement level of the stakeholders during the project execution process. Stakeholders play a vital role in providing the needed resources and Ultimately they have strong influence on project success. The research intends to formulate a matrix which will reflect the list of elements which effect the project execution, type of stakeholder involved for each element, involvement level of each stakeholder which resulted in the delay of the execution, Criticality of involvement on project which will result in the output answer we are seeking the process of involvement for each stakeholder.
评估干系人在项目执行阶段的参与程度
研究的目的是考察项目执行过程中利益相关者的参与程度。干系人在提供所需资源方面起着至关重要的作用,最终他们对项目的成功有很大的影响。本研究拟建立一个矩阵,该矩阵将反映影响项目执行的要素列表、每个要素所涉及的利益相关者类型、导致执行延迟的每个利益相关者的参与程度、项目参与的关键性,这将导致我们正在寻求的每个利益相关者的参与过程的输出答案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信