{"title":"The Applicability of PERT as a Management Tool","authors":"J. Barmby","doi":"10.1109/IRET-EM.1962.5007682","DOIUrl":null,"url":null,"abstract":"This paper discusses the environment in which analytical methods of program evaluation and review (PERT, PEP) are most useful. The conditions under which these techniques are most applicable are discussed. A number of limitations are pointed out. Aspects of the cost of using these techniques are discussed.","PeriodicalId":382847,"journal":{"name":"IRE Transactions on Engineering Management","volume":"44 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1962-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IRE Transactions on Engineering Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IRET-EM.1962.5007682","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
This paper discusses the environment in which analytical methods of program evaluation and review (PERT, PEP) are most useful. The conditions under which these techniques are most applicable are discussed. A number of limitations are pointed out. Aspects of the cost of using these techniques are discussed.