EXPLORATION IN RISK MANAGEMENT IN PRIMAVERA RISK ANALYSIS FOR CONSTRUCTION PROJECT

Dr. K. Yogeswari, Moinuddin H
{"title":"EXPLORATION IN RISK MANAGEMENT IN PRIMAVERA RISK ANALYSIS FOR CONSTRUCTION PROJECT","authors":"Dr. K. Yogeswari, Moinuddin H","doi":"10.52267/ijaser.2021.2406","DOIUrl":null,"url":null,"abstract":"Construction projects are facing several risks that and have negative effects on the project such as time, cost & quality. Risk management is an important field of the construction industry. Many companies often establish a risk management procedure in their projects for improving performance and increase profits. No project is free from risks. The accomplishment of project success in the construction industry mainly depends upon the level of risk. The main objective of the project is to identify the risk and provide the best solutions using primavera risk analysis software. This study investigates risk-related responsibilities for the client, architect & contractor. Some of the risks determined in the project are defective design, financial issues, delay in permitting, availability of drawings, changes in codes & drawing changes in the scope of work, payment delay, accidents during construction. The next goal is to identify risk management techniques in the construction industry. The whole process of identification and mitigation is termed risk management. In Construction projects are concerned with the utilization of skills, tools, techniques, and knowledge about the activities of projects. Management of risk is examined to be the most important part of the execution in construction management. This study has taken a real-time schedule from the construction industry and have implemented the identified risk factors according to risk ranking from the questionnaire survey in construction industry. Based on the risk ranking, a risk model is created in the Primavera risk analysis software for qualitative and quantitative risk. The risk model will generate risk scoring and a risk matrix. Based on this, the schedule to mitigate risk will be generated. We can control the risk in software and an updated risk plan will be given to managers in the construction industry to manage risk more efficiently. It may be concluded that the most significant risks must be managed with greater effort to reduce or eliminate their effects on the project.","PeriodicalId":153802,"journal":{"name":"International Journal of Applied Science and Engineering Review","volume":"35 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Applied Science and Engineering Review","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.52267/ijaser.2021.2406","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Construction projects are facing several risks that and have negative effects on the project such as time, cost & quality. Risk management is an important field of the construction industry. Many companies often establish a risk management procedure in their projects for improving performance and increase profits. No project is free from risks. The accomplishment of project success in the construction industry mainly depends upon the level of risk. The main objective of the project is to identify the risk and provide the best solutions using primavera risk analysis software. This study investigates risk-related responsibilities for the client, architect & contractor. Some of the risks determined in the project are defective design, financial issues, delay in permitting, availability of drawings, changes in codes & drawing changes in the scope of work, payment delay, accidents during construction. The next goal is to identify risk management techniques in the construction industry. The whole process of identification and mitigation is termed risk management. In Construction projects are concerned with the utilization of skills, tools, techniques, and knowledge about the activities of projects. Management of risk is examined to be the most important part of the execution in construction management. This study has taken a real-time schedule from the construction industry and have implemented the identified risk factors according to risk ranking from the questionnaire survey in construction industry. Based on the risk ranking, a risk model is created in the Primavera risk analysis software for qualitative and quantitative risk. The risk model will generate risk scoring and a risk matrix. Based on this, the schedule to mitigate risk will be generated. We can control the risk in software and an updated risk plan will be given to managers in the construction industry to manage risk more efficiently. It may be concluded that the most significant risks must be managed with greater effort to reduce or eliminate their effects on the project.
建设项目前期风险分析中的风险管理探索
建设项目面临着时间、成本、质量等方面的风险。风险管理是建筑行业的一个重要领域。许多公司经常在他们的项目中建立风险管理程序,以提高绩效和增加利润。没有项目是没有风险的。在建筑行业,项目的成功与否主要取决于风险的高低。该项目的主要目标是识别风险,并使用primavera风险分析软件提供最佳解决方案。本研究探讨了客户、建筑师和承包商的风险相关责任。项目中确定的一些风险包括设计缺陷、财务问题、许可延迟、图纸可用性、工作范围内规范和图纸的更改、付款延迟、施工期间的事故。下一个目标是确定建筑行业的风险管理技术。识别和减轻风险的整个过程称为风险管理。在建筑工程中,项目涉及技能、工具、技术和项目活动知识的运用。风险管理是施工管理执行中最重要的环节。本研究采用建筑行业的实时时间表,并根据建筑行业问卷调查的风险排序,将识别出的风险因素进行实施。基于风险排序,在Primavera风险分析软件中建立风险模型,进行定性和定量风险分析。风险模型将生成风险评分和风险矩阵。在此基础上,将生成降低风险的进度。我们可以在软件中控制风险,并向建筑行业的管理人员提供更新的风险计划,以更有效地管理风险。可以得出结论,必须用更大的努力来管理最重要的风险,以减少或消除它们对项目的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信