PROBABILITY DISTRIBUTION OF TIME DURATION OF MANUAL OPERATION IN THE PRODUCTION OF GLASS EYES

AD ALTA: 11/02 Pub Date : 2021-12-31 DOI:10.33543/1102340342
Vladimír Sojka, P. Lepšík
{"title":"PROBABILITY DISTRIBUTION OF TIME DURATION OF MANUAL OPERATION IN THE PRODUCTION OF GLASS EYES","authors":"Vladimír Sojka, P. Lepšík","doi":"10.33543/1102340342","DOIUrl":null,"url":null,"abstract":"When precise planning of capacities and times of production is needed, there must be precise data for calculation. Not all operations have to have a normal time duration distribution. Counting with average values or use values from guessed distribution can lead to mistakes in actual production planning. This article aims to determine time probability distributions to manual operations. Tests of goodness of fit are used to search for more suitable distributions. This approach is presented in a case study of glass eyes manufacturing. Results show that there can be differences between the estimated normal distribution and another more suitable one. By using tests of goodness of fit to define the correct distribution, more precise production and capacity planning results can be achieved.","PeriodicalId":351495,"journal":{"name":"AD ALTA: 11/02","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"AD ALTA: 11/02","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33543/1102340342","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

When precise planning of capacities and times of production is needed, there must be precise data for calculation. Not all operations have to have a normal time duration distribution. Counting with average values or use values from guessed distribution can lead to mistakes in actual production planning. This article aims to determine time probability distributions to manual operations. Tests of goodness of fit are used to search for more suitable distributions. This approach is presented in a case study of glass eyes manufacturing. Results show that there can be differences between the estimated normal distribution and another more suitable one. By using tests of goodness of fit to define the correct distribution, more precise production and capacity planning results can be achieved.
玻璃眼生产中人工操作时间持续时间的概率分布
当需要精确规划生产能力和时间时,必须有精确的数据进行计算。并非所有操作都必须具有正态时间持续分布。用平均值或使用值来计算可能会导致实际生产计划中的错误。本文旨在确定手工操作的时间概率分布。拟合优度检验用于寻找更合适的分布。以玻璃眼制造为例,介绍了该方法。结果表明,估计的正态分布与另一个更合适的正态分布之间可能存在差异。通过拟合优度检验来确定正确的分布,可以得到更精确的生产和产能规划结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信