Fuzzy approach for evaluating risk of service interruption used as criteria in electricity distribution network planning

M. Saric
{"title":"Fuzzy approach for evaluating risk of service interruption used as criteria in electricity distribution network planning","authors":"M. Saric","doi":"10.1109/NEUREL.2014.7011466","DOIUrl":null,"url":null,"abstract":"Electricity distribution network planning is a complex optimization process which requires assessment of various planning criteria. Planning is performed under conditions of system constraints, extreme uncertainty and information imperfection. It is possible, however, to obtain precise output value from imprecise input variables, in a process of fuzzy control. This paper proposes the application of Mamdani type fuzzy inference in modelling the risk of service interruption as one of the criteria used in distribution network planning.","PeriodicalId":402208,"journal":{"name":"12th Symposium on Neural Network Applications in Electrical Engineering (NEUREL)","volume":"4276 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"12th Symposium on Neural Network Applications in Electrical Engineering (NEUREL)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/NEUREL.2014.7011466","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

Abstract

Electricity distribution network planning is a complex optimization process which requires assessment of various planning criteria. Planning is performed under conditions of system constraints, extreme uncertainty and information imperfection. It is possible, however, to obtain precise output value from imprecise input variables, in a process of fuzzy control. This paper proposes the application of Mamdani type fuzzy inference in modelling the risk of service interruption as one of the criteria used in distribution network planning.
配电网中断风险评价的模糊评判方法
配电网规划是一个复杂的优化过程,需要对各种规划准则进行评估。规划是在系统约束、极度不确定性和信息不完善的条件下进行的。然而,在模糊控制过程中,从不精确的输入变量中获得精确的输出值是可能的。本文提出将Mamdani型模糊推理方法应用于配电网络中断风险建模,并将其作为配电网规划的标准之一。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信