Multiple priority dispatching rules for the job shop scheduling problem

M. H. Zahmani, B. Atmani, A. Bekrar, N. Aissani
{"title":"Multiple priority dispatching rules for the job shop scheduling problem","authors":"M. H. Zahmani, B. Atmani, A. Bekrar, N. Aissani","doi":"10.1109/CEIT.2015.7232991","DOIUrl":null,"url":null,"abstract":"In this paper we focus on the Job Shop Scheduling Problem (JSSP) using Priority Dispatching Rules. Simulation model for makespan optimization is proposed using different Dispatching Rules (DR) for each machine in the shop floor. Collected results are used for learning base construction. This database will be used to develop an inference model able to select the best DR for every new scheduling problem. This preliminary study shows advantages of using different DR and also saving progress JSSP data.","PeriodicalId":281793,"journal":{"name":"2015 3rd International Conference on Control, Engineering & Information Technology (CEIT)","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-05-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"12","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 3rd International Conference on Control, Engineering & Information Technology (CEIT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CEIT.2015.7232991","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 12

Abstract

In this paper we focus on the Job Shop Scheduling Problem (JSSP) using Priority Dispatching Rules. Simulation model for makespan optimization is proposed using different Dispatching Rules (DR) for each machine in the shop floor. Collected results are used for learning base construction. This database will be used to develop an inference model able to select the best DR for every new scheduling problem. This preliminary study shows advantages of using different DR and also saving progress JSSP data.
作业车间调度问题的多优先级调度规则
本文主要研究了基于优先级调度规则的作业车间调度问题。提出了针对车间每台机器采用不同调度规则进行最大完工时间优化的仿真模型。收集的结果用于学习库的构建。该数据库将用于开发一个推理模型,该模型能够为每个新的调度问题选择最佳DR。初步研究显示了使用不同DR和保存进度JSSP数据的优点。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信