{"title":"TIME MANAGEMENT IN PROJECT MANAGEMENT OF CORPORATIONS","authors":"N. Bocharova, I. Fedotova","doi":"10.30977/etk.2225-2304.2023.41.41","DOIUrl":null,"url":null,"abstract":"The process of time management in the management of corporate projects is con­sidered. It was determined that time management is the process of deliberately structuring the work schedule of an employee and the enterprise as a whole to best meet the goals set before them. It is proposed to use corporate time management to increase the efficiency of its activities. The main principles of time management are considered, which are: goal orientation, work planning, priori­tization, orientation to opportunities, self-discipline, motivation, effectiveness and quality of rest, documenting goals, distribution of tasks, new activities and new knowledge, hierarchical planning, efficiency of work time distribution, converting creativity, information and communication. 20 most common time management methods used in corporations are analyzed: getting things done, perso­nal efficiency program, Gantt chart for planning tasks and time, do it tomorrow (Mark Forsterʼs method), T. Busenʼs mind map, D. Eisenhowerʼs priority matrix, ALPEN method, elimination me­thod, the \"eat the frog\" method (FrogBusiness), the \"tomato\" method, the \"elephant\" method or the \"salami\" method, fixed time methods (timing), the \"Swiss cheese\" method, the \"6P\" rule, the 50/5 principle, the Vilfredo Pareto (20/80), ABC analysis system, B. Franklinʼs time management system (pyramid), case sorting (M. Clarin method), 100 blocks. It is proposed to understand time manage­ment in project management as establishing the main goal, following it by developing the main stages of implementation, analyzing the availability of resources, setting priorities, developing an appropriate work schedule and monitoring each stage of implementation. Advantages and disad­vantages of each method are separated. It is proposed to understand time management in project management as establishing the main goal, following it by developing the main stages of implemen­tation, analyzing the availability of resources, setting priorities, developing an appropriate work schedule and monitoring each stage of implementation. It was determined that project management is a process of planning, organization, implementation and control over the project in order to achieve the set goal. It has been established that any project team can improve time management through a selection of tools. Choosing the right supplies, toolset, and time management techniques for your project team is critical to keeping everyone on schedule and meeting deadlines.","PeriodicalId":372796,"journal":{"name":"Economics of the transport complex","volume":"53 6 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-03-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Economics of the transport complex","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30977/etk.2225-2304.2023.41.41","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The process of time management in the management of corporate projects is con­sidered. It was determined that time management is the process of deliberately structuring the work schedule of an employee and the enterprise as a whole to best meet the goals set before them. It is proposed to use corporate time management to increase the efficiency of its activities. The main principles of time management are considered, which are: goal orientation, work planning, priori­tization, orientation to opportunities, self-discipline, motivation, effectiveness and quality of rest, documenting goals, distribution of tasks, new activities and new knowledge, hierarchical planning, efficiency of work time distribution, converting creativity, information and communication. 20 most common time management methods used in corporations are analyzed: getting things done, perso­nal efficiency program, Gantt chart for planning tasks and time, do it tomorrow (Mark Forsterʼs method), T. Busenʼs mind map, D. Eisenhowerʼs priority matrix, ALPEN method, elimination me­thod, the "eat the frog" method (FrogBusiness), the "tomato" method, the "elephant" method or the "salami" method, fixed time methods (timing), the "Swiss cheese" method, the "6P" rule, the 50/5 principle, the Vilfredo Pareto (20/80), ABC analysis system, B. Franklinʼs time management system (pyramid), case sorting (M. Clarin method), 100 blocks. It is proposed to understand time manage­ment in project management as establishing the main goal, following it by developing the main stages of implementation, analyzing the availability of resources, setting priorities, developing an appropriate work schedule and monitoring each stage of implementation. Advantages and disad­vantages of each method are separated. It is proposed to understand time management in project management as establishing the main goal, following it by developing the main stages of implemen­tation, analyzing the availability of resources, setting priorities, developing an appropriate work schedule and monitoring each stage of implementation. It was determined that project management is a process of planning, organization, implementation and control over the project in order to achieve the set goal. It has been established that any project team can improve time management through a selection of tools. Choosing the right supplies, toolset, and time management techniques for your project team is critical to keeping everyone on schedule and meeting deadlines.
企业项目管理中的时间管理
考虑了企业项目管理中的时间管理过程。人们确定,时间管理是有意识地组织员工和整个企业的工作时间表,以最好地实现摆在他们面前的目标的过程。建议使用企业时间管理来提高其活动的效率。时间管理的主要原则是:目标导向、工作计划、优先排序、机会导向、自律、动机、休息的有效性和质量、记录目标、任务分配、新活动和新知识、分层规划、工作时间分配的效率、转化创造力、信息和沟通。本文分析了20种最常用的时间管理方法:完成任务,个人效率计划,计划任务和时间的甘特图,明天做(马克·福斯特的方法),t·布森的思维导图,d·艾森豪威尔的优先矩阵,ALPEN方法,消除法,“吃青蛙”方法(FrogBusiness),“番茄”方法,“大象”方法或“腊肠”方法,固定时间方法(时间),“瑞士奶酪”方法,“6P”规则,50/5原则,维尔弗雷多·帕累托(20/80),ABC分析系统,B. Franklin的时间管理系统(金字塔),案例分类(M. Clarin方法),100块。建议将项目管理中的时间管理理解为建立主要目标,通过制定实施的主要阶段,分析资源的可用性,设置优先级,制定适当的工作时间表以及监控实施的每个阶段来遵循目标。每种方法的优点和缺点是分开的。建议将项目管理中的时间管理理解为建立主要目标,通过制定实施的主要阶段,分析资源的可用性,设置优先级,制定适当的工作时间表以及监控实施的每个阶段来遵循目标。确定项目管理是为了实现既定目标而对项目进行计划、组织、实施和控制的过程。已经确定的是,任何项目团队都可以通过选择工具来改进时间管理。为您的项目团队选择正确的供应、工具集和时间管理技术对于保证每个人按计划完成任务至关重要。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信