{"title":"Short term load forecasting for a micro region using NNs and regression models","authors":"Kubra Kaysal, F. Hocaoglu, Y. Oğuz, Ahmet Kaysal","doi":"10.1109/ELECO.2013.6713827","DOIUrl":null,"url":null,"abstract":"Thanks to today's advancing technology, some techniques have been developed to make future oriented forecast on energy generation, transmission and distribution subjects. In literature, load forecasting studies are generally realized for macro size settlement units. However, determination of parameters that effect load forecasting in macro size settlement units is very difficult. In this study, by considering a micro size settlement unit (Güney district of Denizli province), factors that may affect the load demand were examined. Then, by selecting popular methods used in the literature, load forecasting for the region was realized. Finally the results obtained from the models were compared.","PeriodicalId":108357,"journal":{"name":"2013 8th International Conference on Electrical and Electronics Engineering (ELECO)","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 8th International Conference on Electrical and Electronics Engineering (ELECO)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ELECO.2013.6713827","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3
Abstract
Thanks to today's advancing technology, some techniques have been developed to make future oriented forecast on energy generation, transmission and distribution subjects. In literature, load forecasting studies are generally realized for macro size settlement units. However, determination of parameters that effect load forecasting in macro size settlement units is very difficult. In this study, by considering a micro size settlement unit (Güney district of Denizli province), factors that may affect the load demand were examined. Then, by selecting popular methods used in the literature, load forecasting for the region was realized. Finally the results obtained from the models were compared.