{"title":"Applied Mathematical Model for Construction Planning in a Housing Development Project","authors":"Grit Ngowtanasuwan","doi":"10.21834/AJBES.V3I13.140","DOIUrl":null,"url":null,"abstract":"The paper presented a method for solving a construction planning problem in a housing development project using a mathematical model which is an integer linear programming for dividing house construction jobs to three contractors in a project case study. 169 units of the houses in the project would be constructed by the three contractors in two methods, conventional construction method and precast method. The results found a minimum construction cost of the project was 417.69 million baht (M$13.92), and within the total project duration of 72 months. Conclusions and recommendations were discussed in this article.Keywords: Housing Development Project, Mathematical Model, Precast Concrete Construction.eISSN 2398-4295 © 2018. The Authors. Published for AMER ABRA cE-Bs by e-International Publishing House, Ltd., UK. This is an open-access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/). Peer–review under responsibility of AMER (Association of Malaysian Environment-Behaviour Researchers), ABRA (Association of Behavioural Researchers on Asians) and cE-Bs (Centre for Environment-Behaviour Studies), Faculty of Architecture, Planning & Surveying, Universiti Teknologi MARA, Malaysia. DOI: http://dx.doi.org/10.21834/ajbes.v3i13.140","PeriodicalId":439477,"journal":{"name":"Asian Journal of Behavioural Studies","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-08-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Asian Journal of Behavioural Studies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21834/AJBES.V3I13.140","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
应用数学模型在住宅开发项目建设规划中的应用
本文以某住宅开发项目为例,利用整数线性规划数学模型,将住宅建设工作划分为三个承建商,提出了一种解决住宅开发项目施工规划问题的方法。项目中169套房屋将由三家承包商以两种方法建造,传统施工方法和预制方法。结果发现,该项目的最低建设成本为4.1769亿泰铢(13.92美元),项目总工期为72个月。本文讨论了结论和建议。关键词:住宅开发项目,数学模型,预制混凝土施工。eISSN 2398-4295©2018。作者。英国e-International Publishing House, Ltd.为AMER ABRA cE-Bs出版。这是一篇基于CC BY-NC-ND许可(http://creativecommons.org/licenses/by-nc-nd/4.0/)的开放获取文章。由马来西亚玛拉理工大学建筑、规划与测量学院AMER(马来西亚环境行为研究协会)、ABRA(亚洲行为研究协会)和cE-Bs(环境行为研究中心)负责的同行评审。DOI: http://dx.doi.org/10.21834/ajbes.v3i13.140
本文章由计算机程序翻译,如有差异,请以英文原文为准。