{"title":"Simulation of the impact of lighting on the ground wire in 400 kV transmission lines","authors":"J. Pedroza, J. Toledo, W. Osal, C. Vásquez, F. Mendoza","doi":"10.1109/EPQU.2011.6128890","DOIUrl":null,"url":null,"abstract":"Due to the importance of the hydroelectric project of 400 kV Tocoma for compliance with the requirements of demand, with high operational safety, we present the development of this work. Its objective consists in to analyze the behavior of the isolation of the transmission towers to the entrance of the bay of the substation due the impact of lightning on ground wire. We obtain the behavior of the line considering lightning of 5 and 20 kA and ground resistance at the foot of the tower of 0, 20, 100 and 400 Ω, using the simulation program PSCAD / EMTDC. The results show that none of the simulated cases are above the recommended level for line; however, to lightning of 20 kA and 400 Ω of resistance, the tension obtained of phase to ground is twice normal operation of the system, a value close to the limit let to the system.","PeriodicalId":369941,"journal":{"name":"11th International Conference on Electrical Power Quality and Utilisation","volume":"163 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"11th International Conference on Electrical Power Quality and Utilisation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EPQU.2011.6128890","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Due to the importance of the hydroelectric project of 400 kV Tocoma for compliance with the requirements of demand, with high operational safety, we present the development of this work. Its objective consists in to analyze the behavior of the isolation of the transmission towers to the entrance of the bay of the substation due the impact of lightning on ground wire. We obtain the behavior of the line considering lightning of 5 and 20 kA and ground resistance at the foot of the tower of 0, 20, 100 and 400 Ω, using the simulation program PSCAD / EMTDC. The results show that none of the simulated cases are above the recommended level for line; however, to lightning of 20 kA and 400 Ω of resistance, the tension obtained of phase to ground is twice normal operation of the system, a value close to the limit let to the system.
照明对400kv输电线路接地线影响的模拟
鉴于400千伏Tocoma水电工程对符合需求要求、运行安全性高的重要性,提出了该项工作的发展情况。其目的在于分析在雷击对地线的影响下,输电塔对变电站出入口的隔离性能。我们利用PSCAD / EMTDC仿真程序,得到了考虑5和20 kA雷电和塔底0、20、100和400 Ω地阻的线路行为。结果表明:所有模拟工况均不超过推荐线;而对于20ka雷电和400 Ω电阻,得到的相对地张力是系统正常运行时的两倍,接近系统允许的极限值。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信