Land Reclamation using Construction Waste for Offshore Gaza Fishery Port

Mazen Abualtayef, H. Ziara, A. Seif
{"title":"Land Reclamation using Construction Waste for Offshore Gaza Fishery Port","authors":"Mazen Abualtayef, H. Ziara, A. Seif","doi":"10.52865/griy1218","DOIUrl":null,"url":null,"abstract":"The world experience rapidly growing in population density and lack of areas especially coastal areas, which is considered the most vital, economic and cultural areas around the world. This force the experts investigating different suggestions such as sea reclamation and its exploitation for many goals>In this study, it is proposed to relocate the construction features of the Gaza fishery port for better sediment transport and hydraulic conditions. Therefore, the study methodology started with estimation of the construction waste quantity resulted from 2014 aggression, then ensuring its testing results, specifications and possibility of using it in land reclamation. Furthermore, the existing Gaza fishery port sediment transportation and features were studied and its bathymetry was identified. As a result, the new proposed reclaimed area was identified in west of the existing western breakwater at Gaza fishery port and its area was estimated according to estimation the quantity of debris resulted from removing the existing breakwaters in addition to construction wastes resulted from 2014 aggression. The total estimated quantity of available debris is about one million cubic meters, which adequate to reclaim about 11 hectares. However, the new reclaimed area should be surrounded by sheet piles, so the sheet pile type is assumed to be PZC 28 and finally the total cost of the proposed reclaimed area was estimated as USD130 per square meter of reclaimed area. Finally, to facilitate transportation and movement through this reclaimed area, the bridge is recommended to be constructed. Finally, the cost of sea reclamation is feasible especially that Gaza fishery seaport is very vital and important place, which will be as a fishery port and for recreational activities.","PeriodicalId":223912,"journal":{"name":"Israa University Journal for Applied Science","volume":"33 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Israa University Journal for Applied Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.52865/griy1218","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The world experience rapidly growing in population density and lack of areas especially coastal areas, which is considered the most vital, economic and cultural areas around the world. This force the experts investigating different suggestions such as sea reclamation and its exploitation for many goals>In this study, it is proposed to relocate the construction features of the Gaza fishery port for better sediment transport and hydraulic conditions. Therefore, the study methodology started with estimation of the construction waste quantity resulted from 2014 aggression, then ensuring its testing results, specifications and possibility of using it in land reclamation. Furthermore, the existing Gaza fishery port sediment transportation and features were studied and its bathymetry was identified. As a result, the new proposed reclaimed area was identified in west of the existing western breakwater at Gaza fishery port and its area was estimated according to estimation the quantity of debris resulted from removing the existing breakwaters in addition to construction wastes resulted from 2014 aggression. The total estimated quantity of available debris is about one million cubic meters, which adequate to reclaim about 11 hectares. However, the new reclaimed area should be surrounded by sheet piles, so the sheet pile type is assumed to be PZC 28 and finally the total cost of the proposed reclaimed area was estimated as USD130 per square meter of reclaimed area. Finally, to facilitate transportation and movement through this reclaimed area, the bridge is recommended to be constructed. Finally, the cost of sea reclamation is feasible especially that Gaza fishery seaport is very vital and important place, which will be as a fishery port and for recreational activities.
利用建筑垃圾开垦加沙近海渔港
世界经历了人口密度的迅速增长和地区的缺乏,特别是沿海地区,被认为是世界上最重要的经济和文化地区。这迫使专家们调查不同的建议,如填海及其开发,以实现许多目标。在这项研究中,建议重新安置加沙渔港的建筑特征,以获得更好的泥沙运输和水力条件。因此,研究方法从估算2014年侵略产生的建筑垃圾数量开始,然后确保其检测结果,规格和在土地复垦中使用的可能性。此外,还研究了现有加沙渔港的泥沙运移及其特征,并对其水深进行了识别。因此,在加沙渔港现有的西部防波堤以西确定了新的拟议填海区域,其面积是根据拆除现有防波堤所产生的碎片数量以及2014年侵略造成的建筑废物的估计来估计的。估计可利用的垃圾总数约为100万立方米,足以填海约11公顷。但由于新填海区域需要采用板桩围合,故假设板桩类型为PZC 28,最终估算建议填海区域的总成本为每平方米填海面积130美元。最后,为了方便通过这片填海地区的交通和活动,建议建造这座桥。最后,填海的费用是可行的,特别是加沙渔港是非常重要和重要的地方,它将作为渔港和娱乐活动。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信