Working time losses in production lines with hybrid automation - case study

M. Siemieniak
{"title":"Working time losses in production lines with hybrid automation - case study","authors":"M. Siemieniak","doi":"10.1109/ROMOCO.2004.240962","DOIUrl":null,"url":null,"abstract":"The paper presents the results of researches done in some of the machine industry company. The researches are concerned with the problem of utilization of the work places and workers working time resources in production lines. The production process route and the identification of whole process were presented. It becomes possible to define forms of the forwarding batches route in the production process. The process identification and definition of its weaknesses make a base of the working time losses analysis.","PeriodicalId":176081,"journal":{"name":"Proceedings of the Fourth International Workshop on Robot Motion and Control (IEEE Cat. No.04EX891)","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2004-06-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Fourth International Workshop on Robot Motion and Control (IEEE Cat. No.04EX891)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ROMOCO.2004.240962","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The paper presents the results of researches done in some of the machine industry company. The researches are concerned with the problem of utilization of the work places and workers working time resources in production lines. The production process route and the identification of whole process were presented. It becomes possible to define forms of the forwarding batches route in the production process. The process identification and definition of its weaknesses make a base of the working time losses analysis.
混合自动化生产线的工作时间损失-案例研究
本文介绍了在某机械工业公司所做的研究结果。研究了生产线上工作场所和工人工作时间资源的利用问题。给出了生产工艺路线及整个工艺过程的识别。在生产过程中定义转发批次路由的形式成为可能。过程识别和弱点定义是分析工作时间损失的基础。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信