Supply Chain Rhythm: Multidisciplinary Teams Through Collaborative Work Structuring

R. Broft, S. Pryke
{"title":"Supply Chain Rhythm: Multidisciplinary Teams Through Collaborative Work Structuring","authors":"R. Broft, S. Pryke","doi":"10.24928/2019/0272","DOIUrl":null,"url":null,"abstract":"Collaborative work structuring methods are increasingly used in the construction industry to support project teams on delivering their projects on time, within budget and with high quality. By breaking down the work to be done in so-called manageable chunks, work structuring plays an important role in the creation of flow. The optimisation of flow is important due to the fragmented nature of the industry. Despite successful examples of the application of these methods, it is believed that the advantages remain limited to achieving better project results. Where current examples organise working packages around the work of different trades, this paper explores the consequences of a more supply chain-driven approach to collaborative work structuring. It challenges trades to design a “Supply Chain Rhythm”. The results presented in this paper show additional advantages, where multidisciplinairy teams have been created within a project. This way, the configuration of the crew performing the work chunk exceeds the boundaries of organisations or trades, and leads to further optimisation of the work flow.","PeriodicalId":278113,"journal":{"name":"Proc. 27th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-07-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proc. 27th Annual Conference of the International Group for Lean Construction (IGLC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24928/2019/0272","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

Collaborative work structuring methods are increasingly used in the construction industry to support project teams on delivering their projects on time, within budget and with high quality. By breaking down the work to be done in so-called manageable chunks, work structuring plays an important role in the creation of flow. The optimisation of flow is important due to the fragmented nature of the industry. Despite successful examples of the application of these methods, it is believed that the advantages remain limited to achieving better project results. Where current examples organise working packages around the work of different trades, this paper explores the consequences of a more supply chain-driven approach to collaborative work structuring. It challenges trades to design a “Supply Chain Rhythm”. The results presented in this paper show additional advantages, where multidisciplinairy teams have been created within a project. This way, the configuration of the crew performing the work chunk exceeds the boundaries of organisations or trades, and leads to further optimisation of the work flow.
供应链节奏:通过协同工作结构的多学科团队
协作工作结构方法越来越多地用于建筑行业,以支持项目团队按时、在预算范围内、高质量地交付项目。通过将要完成的工作分解成所谓可管理的块,工作结构在流的创建中起着重要的作用。由于行业的分散性,优化流程非常重要。尽管这些方法有成功的应用实例,但人们认为其优势仍然局限于取得更好的项目结果。在当前的例子中,围绕不同行业的工作组织工作包,本文探讨了更多供应链驱动的协作工作结构方法的后果。它要求行业设计一种“供应链节奏”。本文给出的结果显示了在一个项目中创建多学科团队的额外优势。通过这种方式,执行工作块的人员配置超越了组织或行业的界限,并导致工作流程的进一步优化。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信