{"title":"Improvement through Analysis of Current Open Book Policy for the Korean CM at Risk","authors":"Kyungmo Park, Chang-Duk Kim","doi":"10.6106/KJCEM.2016.17.2.003","DOIUrl":null,"url":null,"abstract":"CM at Risk has been introduced in Korea to keep up with the global standards of construction management and provide a higher quality of cm service in line with a rapid change of the construction industry recently. However, it is widely considered that more time would required to settle down the system due to a lack of understanding towards CM at Risk, shortage of reliability and low capability to manage and undertake CM at Risk. Therefore, this research is analyzed problems of contract types, open book policies, and contract conditions of 33 numbers of projects undertaken by a bespoke domestic construction management firm in this research. Moreover, this research is suggested a method to establish an open book policy of CM at Risk aiming a better customers satisfaction through staff training, simplifying and improving a payment system, and a way to settle down an open book policy by improving a performance management system on site. It's expected that this research will contribute to a more competitive system with more dominating the market and a differentiation of the service so as clients to rely more on the CM at Risk.","PeriodicalId":220018,"journal":{"name":"Korean Journal of Construction Engineering and Management","volume":"84 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-03-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Korean Journal of Construction Engineering and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.6106/KJCEM.2016.17.2.003","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
CM at Risk has been introduced in Korea to keep up with the global standards of construction management and provide a higher quality of cm service in line with a rapid change of the construction industry recently. However, it is widely considered that more time would required to settle down the system due to a lack of understanding towards CM at Risk, shortage of reliability and low capability to manage and undertake CM at Risk. Therefore, this research is analyzed problems of contract types, open book policies, and contract conditions of 33 numbers of projects undertaken by a bespoke domestic construction management firm in this research. Moreover, this research is suggested a method to establish an open book policy of CM at Risk aiming a better customers satisfaction through staff training, simplifying and improving a payment system, and a way to settle down an open book policy by improving a performance management system on site. It's expected that this research will contribute to a more competitive system with more dominating the market and a differentiation of the service so as clients to rely more on the CM at Risk.
最近,随着建设行业的急剧变化,为了跟上世界建设管理的标准,提供更高质量的CM服务,引进了“风险CM”。然而,人们普遍认为,由于缺乏对风险管理的理解,缺乏可靠性,管理和承担风险管理的能力较低,需要更多的时间来确定系统。因此,本研究对国内某工程定制管理公司承接的33个项目的合同类型、开卷政策、合同条件等问题进行了分析。此外,本研究还提出了通过员工培训、简化和完善薪酬制度来建立风险管理公司的开卷政策以提高客户满意度的方法,以及通过改进现场绩效管理制度来确定开卷政策的方法。预计本研究将有助于建立一个更具竞争力的系统,更加主导市场和差异化的服务,使客户更多地依赖于CM at Risk。