Ancillary services in the Iberian Electricity market — Current situation and harmonization approaches

J. Saraiva, H. Heitor, Nuno Correia, Rui Araujo
{"title":"Ancillary services in the Iberian Electricity market — Current situation and harmonization approaches","authors":"J. Saraiva, H. Heitor, Nuno Correia, Rui Araujo","doi":"10.1109/EEM.2011.5953074","DOIUrl":null,"url":null,"abstract":"This paper addresses the provision of ancillary services in Portugal and Spain in the scope of the Common Iberian Electricity market. The paper reviews the definitions and the international practice regarding ancillary services with emphasis on primary, secondary and tertiary reserves and describes the procedures adopted by the Portuguese and Spanish TSO's to procure and allocate reserve levels. On the other hand, the paper discusses the models that can be used to enlarge the integration of the reserve markets, namely regarding tertiary reserve. Using data from 2009, the paper presents the results of the simulations that were performed for several situations including an ideal unlimited interconnection capacity, the existing interconnection capacity and an interconnection capacity increased by 300 MW. The results obtained indicate that the adoption of a common tertiary reserve list would ultimately be beneficial for the consumers since the cost of tertiary reserve would be reduced. However, a larger integration and cooperation between the two TSO's would be clearly required.","PeriodicalId":143375,"journal":{"name":"2011 8th International Conference on the European Energy Market (EEM)","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-05-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 8th International Conference on the European Energy Market (EEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEM.2011.5953074","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

Abstract

This paper addresses the provision of ancillary services in Portugal and Spain in the scope of the Common Iberian Electricity market. The paper reviews the definitions and the international practice regarding ancillary services with emphasis on primary, secondary and tertiary reserves and describes the procedures adopted by the Portuguese and Spanish TSO's to procure and allocate reserve levels. On the other hand, the paper discusses the models that can be used to enlarge the integration of the reserve markets, namely regarding tertiary reserve. Using data from 2009, the paper presents the results of the simulations that were performed for several situations including an ideal unlimited interconnection capacity, the existing interconnection capacity and an interconnection capacity increased by 300 MW. The results obtained indicate that the adoption of a common tertiary reserve list would ultimately be beneficial for the consumers since the cost of tertiary reserve would be reduced. However, a larger integration and cooperation between the two TSO's would be clearly required.
伊比利亚电力市场的辅助服务-现状和协调方法
本文讨论了在共同伊比利亚电力市场范围内葡萄牙和西班牙提供的辅助服务。本文回顾了有关辅助服务的定义和国际惯例,重点是初级、二级和三级储备,并介绍了葡萄牙和西班牙TSO采用的程序,以获取和分配储备水平。另一方面,本文讨论了扩大储备市场一体化的模型,即三级储备模型。利用2009年的数据,给出了理想无限互联容量、现有互联容量和增加300mw互联容量的几种情况下的仿真结果。结果表明,采用统一的三级储备清单最终将有利于消费者,因为三级储备的成本将会降低。但是,显然需要两个TSO之间进行更大的整合和合作。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信