Agile Baukastenentwicklung – Chancen und Herausforderungen bei der Implementierung in der Entwicklungspraxis am Beispiel der Zuverlässigkeit von Sprintzusagen
{"title":"Agile Baukastenentwicklung – Chancen und Herausforderungen bei der Implementierung in der Entwicklungspraxis am Beispiel der Zuverlässigkeit von Sprintzusagen","authors":"Linda Mauch, Martin Steyer, N. Bursac","doi":"10.35199/dfx2019.25","DOIUrl":null,"url":null,"abstract":"Agile frameworks such as Scrum contribute to a flexible product development process. In a scaled agile modular design development environment at TRUMPF Group. research shows that not all committed Backlog-Items are completed by the end of the sprint. By applying the Design Research Methodology by BLESSING and CHAKRABARTI. factors that influence the reliability of sprint commitment were identified. Furthermore. support was developed for two influencing factors.","PeriodicalId":235355,"journal":{"name":"DFX 2019: Proceedings of the 30th Symposium Design for X, 18-19 September 2019, Jesteburg, Germany","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-09-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"DFX 2019: Proceedings of the 30th Symposium Design for X, 18-19 September 2019, Jesteburg, Germany","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35199/dfx2019.25","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Agile frameworks such as Scrum contribute to a flexible product development process. In a scaled agile modular design development environment at TRUMPF Group. research shows that not all committed Backlog-Items are completed by the end of the sprint. By applying the Design Research Methodology by BLESSING and CHAKRABARTI. factors that influence the reliability of sprint commitment were identified. Furthermore. support was developed for two influencing factors.