Design and Implement for Reducing the Temporary High Load of Device in Industrial Networks

Tsung-Sheng Cheng, Kuen-Min Lee, Yi-Hung Lu, M. Huang, Wan-Ting Hong
{"title":"Design and Implement for Reducing the Temporary High Load of Device in Industrial Networks","authors":"Tsung-Sheng Cheng, Kuen-Min Lee, Yi-Hung Lu, M. Huang, Wan-Ting Hong","doi":"10.1109/ICSSE.2018.8519966","DOIUrl":null,"url":null,"abstract":"With the concept of Industry 4.0 spreading, smart manufacturing is going to work in a brand new production process, in which a number of technologies are integrated, including cyber-physical systems, the Internet of Things, and the Internet of Services, to facilitate a new business model of “smart manufacturing and service”. The key to an intelligent automation system is the capability of software/hardware system integration regarding various equipments and controllers, where response time of the equipment plays an important role. However, in an industrial transmission network, the hardware specification of the receiver is probably not good enough, so that the processor in the receiver may be unable to process multiple requests simultaneously. This paper proposes a method for scheduling multiple periodic requests. This method can reduce the burden on the device when the device is high loading in order to maintain the effective operation of the device.","PeriodicalId":431387,"journal":{"name":"2018 International Conference on System Science and Engineering (ICSSE)","volume":"95 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 International Conference on System Science and Engineering (ICSSE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSSE.2018.8519966","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

With the concept of Industry 4.0 spreading, smart manufacturing is going to work in a brand new production process, in which a number of technologies are integrated, including cyber-physical systems, the Internet of Things, and the Internet of Services, to facilitate a new business model of “smart manufacturing and service”. The key to an intelligent automation system is the capability of software/hardware system integration regarding various equipments and controllers, where response time of the equipment plays an important role. However, in an industrial transmission network, the hardware specification of the receiver is probably not good enough, so that the processor in the receiver may be unable to process multiple requests simultaneously. This paper proposes a method for scheduling multiple periodic requests. This method can reduce the burden on the device when the device is high loading in order to maintain the effective operation of the device.
降低工业网络中设备临时高负荷的设计与实现
随着工业4.0概念的传播,智能制造将在一个全新的生产过程中发挥作用,其中包括网络物理系统,物联网和服务互联网等多项技术的集成,以促进“智能制造和服务”的新商业模式。智能自动化系统的关键是各种设备和控制器的软硬件系统集成能力,其中设备的响应时间起着重要的作用。然而,在工业传输网络中,接收器的硬件规格可能不够好,因此接收器中的处理器可能无法同时处理多个请求。提出了一种调度多个周期请求的方法。该方法可在设备高负荷时减轻设备负担,以维持设备的有效运行。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信