7. Basic Management Techniques

{"title":"7. Basic Management Techniques","authors":"","doi":"10.1177/0962144x1389007","DOIUrl":null,"url":null,"abstract":"Introduction 7-02 The role of the manager 7-02 Manager or administrator? 7-03 Permission to manage 7-04 Management skills and function 7-05 Planning 7-05 Watching the outside world 7-06 Who’s who? 7-06 Reviewing the practice within the wider environment 7-09 The business or development plan 7-10 Formulating a business plan 7-11 Planning techniques 7-13 Action plans 7-15 Leadership 7-17 Team building and motivation 7-18 Why do people work? 7-18 Team definitions, vision statements and team functions 7-19 Stages of team development 7-22 Building a team 7-23 Delegation 7-27 Management of change 7-30 The process of change—‘evolution, not revolution’ 7-30 Reasons for change 7-30 Recognising the need for change 7-30 Announcing proposed change 7-31 Implementation of change 7-32 The manager’s ultimate question: ‘Is it cost-effective?’ 7-34 Dealing with imposed change and uncertainty 7-34 Effective meetings 7-35 Before 7-35 During 7-37 After 7-37 The staff meeting 7-38 Problem solving 7-39 What are the distinctions between problems, solutions and plans? 7-39 Defining problems and generating solutions 7-41 Barriers to effective problem solving 7-43 Project management 7-44 What is a project? 7-44 Define the project and its key objectives 7-44 Write a project synopsis 7-46 Gain approval 7-46 Appoint a project manager and project team 7-46 The role of the project manager 7-47 Write a detailed project plan 7-47 Project management planning tools 7-47 Allocate responsibilities 7-51 Identify milestones and events 7-51 Monitoring methods 7-51 Project evaluation 7-52 Summary 7-52 Time management 7-53 Saving time 7-55 Hints to make better use of time 7-56 Negotiating skills 7-56 Definition of negotiation 7-56 1. Preparation 7-57 2. Openings 7-57 3. Testing 7-58 4. Concessions and bargaining 7-58 5. Conclusions and agreement 7-58 6. Review or audit 7-59 Negotiating techniques 7-59","PeriodicalId":413688,"journal":{"name":"Handbook of Practice Management","volume":"47 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Handbook of Practice Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1177/0962144x1389007","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Introduction 7-02 The role of the manager 7-02 Manager or administrator? 7-03 Permission to manage 7-04 Management skills and function 7-05 Planning 7-05 Watching the outside world 7-06 Who’s who? 7-06 Reviewing the practice within the wider environment 7-09 The business or development plan 7-10 Formulating a business plan 7-11 Planning techniques 7-13 Action plans 7-15 Leadership 7-17 Team building and motivation 7-18 Why do people work? 7-18 Team definitions, vision statements and team functions 7-19 Stages of team development 7-22 Building a team 7-23 Delegation 7-27 Management of change 7-30 The process of change—‘evolution, not revolution’ 7-30 Reasons for change 7-30 Recognising the need for change 7-30 Announcing proposed change 7-31 Implementation of change 7-32 The manager’s ultimate question: ‘Is it cost-effective?’ 7-34 Dealing with imposed change and uncertainty 7-34 Effective meetings 7-35 Before 7-35 During 7-37 After 7-37 The staff meeting 7-38 Problem solving 7-39 What are the distinctions between problems, solutions and plans? 7-39 Defining problems and generating solutions 7-41 Barriers to effective problem solving 7-43 Project management 7-44 What is a project? 7-44 Define the project and its key objectives 7-44 Write a project synopsis 7-46 Gain approval 7-46 Appoint a project manager and project team 7-46 The role of the project manager 7-47 Write a detailed project plan 7-47 Project management planning tools 7-47 Allocate responsibilities 7-51 Identify milestones and events 7-51 Monitoring methods 7-51 Project evaluation 7-52 Summary 7-52 Time management 7-53 Saving time 7-55 Hints to make better use of time 7-56 Negotiating skills 7-56 Definition of negotiation 7-56 1. Preparation 7-57 2. Openings 7-57 3. Testing 7-58 4. Concessions and bargaining 7-58 5. Conclusions and agreement 7-58 6. Review or audit 7-59 Negotiating techniques 7-59
7. 基本管理技巧
7-02管理员角色7-02管理员还是管理员?7-03管理权限7-04管理技能与功能7-05规划7-05观察外部世界7-06谁是谁?7-06在更广泛的环境中回顾实践7-09业务或发展计划7-10制定业务计划7-11规划技术7-13行动计划7-15领导能力7-17团队建设和激励7-18人们为什么工作?7-18团队定义、愿景陈述和团队职能7-19团队发展阶段7-22建立团队7-23授权7-27变革管理7-30变革的过程-“演变,而不是革命”7-30变革的原因7-30认识到变革的必要性7-30宣布提出的变革7-31变革的实施7-32管理者的最终问题:“它具有成本效益吗?”处理强加的变化和不确定性有效的会议7-35之前7-35期间7-37之后7-37员工会议解决问题问题、解决方案和计划之间的区别是什么?7-39定义问题并提出解决方案7-41有效解决问题的障碍7-43项目管理7-44什么是项目?7-44定义项目及其主要目标7-44撰写项目概要7-46获得批准7-46任命项目经理和项目团队7-46项目经理的角色7-47撰写详细的项目计划7-47项目管理计划工具7-47分配职责7-51确定里程碑和事件7-51监控方法7-51项目评估7-52总结7-52时间管理7-53节省时间7-55更好地利用时间的提示7-56谈判技巧7-56定义谈判7-56准备工作7-57开场7-57测试7-58让步和讨价还价7-58结论与协议7-587-59谈判技巧7-59
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书